Laserfiche WebLink
Comprehensive Plan <br />Capital Improvements Element <br />determination purposes. Through contact with other county departments, planning staff are able to <br />modify capacity estimates as soon as facility characteristics are changed. <br />Table 6.17 depicts the general structure of the monitoring system data base file for each public facility <br />category. This table shows that available capacity for each specific facility is a function of total <br />capacity less existing demand and less committed demand. The demand section of this concurrency <br />management plan identifies the methodology for assessing demand. <br />Table 6.17: Monitoring System Design <br />Public Facility <br />Category <br />Specific <br />Facilities <br />Total Capacity <br />Existing Demand <br />Committed Demand <br />Available Capacity <br />Traffic <br />Roadways <br />Peak season/ <br />peak direction/ <br />peak hour (LOS <br />D) <br />Annual count (average) <br />(peak season/peak <br />direction/peak hour) <br />Volume estimated from <br />approved Development <br />Orders (DO) <br />(Total Capacity) - <br />(Existing Demand)- <br />(Committed Demand) <br />Sanitary Sewer <br />Treatment Plants <br />Design flows <br />Existing flowsapproved <br />Volume estimated from <br />DO's <br />(Total Capacity)- <br />(Existing Demand)- <br />(Committed Demand) <br />Potable Water <br />Treatment Plants <br />Design flows <br />Existing flowsapproved <br />Volume estimated from <br />DO's <br />(Total Capacity)- <br />(Existing Demand)- <br />(Committed Demand) <br />Solid Waste <br />Landfill <br />Active cell <br />design capacity <br />Active cell volume used <br />Volume estimated from <br />approved DO's <br />(Total Capacity)- <br />(Existing Demand)- <br />(Committed Demand) <br />Recreation <br />Parks <br />Park Acreage <br />(Acres per thousand <br />population) X (existing <br />population) <br />(Acres per thousand <br />population) X (projected <br />population for approved <br />DO's) <br />(Total Capacity)- <br />(Existing Demand)- <br />(Committed Demand) <br />Drainage <br />Drainage <br />conveyances <br />Volume <br />Existing flows <br />Volume of stormwater <br />allowed to outfall for <br />approved DO's <br />(Total Capacity)- <br />(Existing Demand) - <br />(Committed Demand) <br />Education <br />Public <br />Schools(K-12, <br />....................._..._ <br />Permanent <br />Annual Enrollment <br />Students estimated from <br />Total Ca �acityj - <br />Student Station <br />F <br />Count .LE 1 L)_ <br />__._ <br />a proved.res�_denhal <br />eveTonme� c7rdefs) <br />>:xistmgDemanu= <br />T <br />C'ii"riiini ied Demand) <br />To implement the monitoring system, the following actions shown in table 6.18 will be necessary. <br />Community Development Department <br />Indian River County <br />49 <br />