My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/5/1975
CBCC
>
Meetings
>
1970's
>
1975
>
3/5/1975
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2024 10:16:23 AM
Creation date
6/10/2015 3:42:48 PM
Metadata
Fields
Template:
Meetings
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE BOARD RECESSED AT 12:00 O'CLOCK NOON AND RECONVENED AT <br />1:30 O'CLOCK P.M. <br />ON MOTION BY COMMISSIONER SCHMUCKER, SECONDED BY COMMISSIONER <br />MASSEY, THE BOARD UNANIMOUSLY ACCEPTED THE BID OF NEELY'S REPAIR <br />SHOP, VERO BEACH FOR A GASOLINE ENGINE - WISCONSIN MODEL -18 HORSE- <br />POWER ENGINE WITH 25 AMPERES, AS BEING THE LOWEST AND BEST BID <br />MEETING SPECIFICATIONS IN THE AMOUNT OF $835.62. <br />AT THE FEBRUARY 19, 1975 BOARD MEETING, THE BOARD DISCUSSED <br />A PETITION RECEIVED REGARDING THE COUNTY BUILDING A SIDEWALK ALONG <br />NORTH GIFFORD ROAD FROM 43RD AVENUE WEST FOR APPROXIMATELY THREE- <br />QUARTERS OF A MILE.. THE BOARD: AGREED THAT THIS REQUEST SHOULD <br />INITIATE FROM THE SCHOOL BOARD. <br />IN A LETTER DATED FEBRUARY 26TH FROM THE SCHOOL BOARD THEY <br />HAVE REQUESTED THAT SIDEWALKS BE CONSTRUCTED ON NORTH GIFFORD ROA.- <br />FOR THE SAFETY OF THE CHILDREN WALKING TO SCHOOL. <br />THE COUNTY ADMINISTRATOR STATED THAT THERE IS A 60•FOOT <br />RIGHT-OF-WAY . ON THE SOUTH SIDE OF NORTH GIFFORD ROAD THERE IS <br />30 FEET BUT THE INDIAN RIVER FARMS WATER MANAGEMENT DISTRICT HAS <br />A DRAINAGE CANAL ALONG THIS SOUTH SIDE. HE CONTINUED THAT HE <br />HAS NOT BEEN ABLE TO DETERMINE IF THERE ARE MURPHY ACT TITLES <br />FROM 43RD ST. TO KINGS HIGHWAY ON THE NORTH SIDE WITHOUT GOING <br />THROUGH THE EXPENSE OF A TITLE SEARCH. UNLESS THE COUNTY HAS <br />SUFFICIENT RIGHT-OF-WAY IT WOULD BE IMPOSSIBLE TO BUILD A SIDEWALK <br />ON THE NORTH SIDE OF NORTH GIFFORD ROAD. <br />THE COUNTY ADMINISTRATOR STATED THAT IN THE LETTER FROM THE. <br />SCHOOL BOARD IT WAS THEIR SUGGESTION THAT THE SIDEWALK BE CONSTRUCTED <br />BETWEEN THE DRAINAGE DITCH AND THE RIGHT-OF-WAY ON THE SOUTH SIDE OF <br />NORTH GIFFORD ROAD, BUT THAT WOULD BE ON DRAINAGE DISTRICT PROPERTY. <br />COMMISSIONER SCHMUCKER SUGGESTED A FOUR FOOT SIDWALK BE <br />CONSTRUCTED, IF THE DRAINAGE DISTRICT APPROVED, WITH THE SIDEWALK <br />PLACED SO THAT DITCH CLEANING EQUIPMENT COULD STRADDLE IT. <br />THE BOARD AGREED THAT THE FIRST STEP WOULD BE FOR THE <br />COUNTY ADMINISTRATOR TO CONTACT THE INDIAN RIVER FARMS WATER MANAGE- <br />MENT DISTRICT FOR THEIR APPROVAL. <br />AT THE FEBRUARY 5TH AND FEBRUARY 19TH, 1975 BOARD MEETINGS, <br />THE BOARD DISCUSSED FRED AND RICHARD MORRILL OPERATING ANDY'S <br />SANITATION WITHOUT OBTAINING AN ASSIGNMENT OF TRANSFER OF ANDY'S <br />-10- <br />LIAR 5157 <br />Km 22 pia 85 <br />t <br />
The URL can be used to link to this page
Your browser does not support the video tag.