Laserfiche WebLink
REGULAR DOT CONTRACT AS THE COUNTY EQUIPP^ENT IS TIED UP AND WE WOULD <br />HAVE TO HIRE EQUIPMENT. <br />ADMINISTRATOR JENNINGS INFORMED THE BOARD THAT THE DEEDS <br />RECEIVED FROM THE HOSPITAL AND VERO MED WERE TAKEN TO THE DOT ON THE <br />15TH TO BE REVIEWED AS HE DID NOT FEEL THEY SHOULD BE PRESENTED TO <br />THE BOARD UNTIL WE LEARN WHAT THE DOT FEELS ABOUT THEM. HE CONTINUED <br />THAT BARBER AVENUE WILL BE BUILT AND THE DITCHES CUT, BUT NOT UNTIL <br />ALL OF THE•RIGHTS-OF-,9AY ARE ACQUIRED, NOT JUST THE HOSPITAL'S <br />DISCUSSION FOLLOWED AS TO THE REMAINING RIGHTS-OF-WAY THAT <br />NEED TO BE ACQUIRED. <br />ATTORNEY STEWART POINTED OUT THAT THE HOSPITAL IS LEFT IN AN <br />AWKWARD SITUATION AND ASKED WHETHER THEY SHOULD TAKE CONTROL OF THEIR <br />OWN SITUATION; CONDEMN T14E PROPERTY AND DIG.THE DITCH; OR SHOULD THEY <br />JUST WAIT SOME MORE, <br />ADMINISTRATOR JENNINGS COMMENTED'THAT IF THE HOSPITAL GOES <br />AHEAD AND GETS THEIR 01,1RDRAINAGE EASEMENTS AND WORKS IT OUT WITH THE <br />DER TO RUN THE DRAINAGE INTO THE RIVER, POSSIBLY THAT IS THE WAY TO <br />60, BUT POINTED OUT IF THE EASEMENTS WERE COMPLETE AND WERE TURNED <br />OVER TO THE BOARD, WE WOULDN'T EVEN HAVE TO GO THROUGH DOT EXCEPT IT <br />WOULD BEAN ADVANTAGE I14 GOING THROUGH THE ENVIRONMENTAL REGULATIONS. <br />COMMISSIONER SIEBERT INQUIRED IF THE MAIN ENTRANCE TO THE <br />HOSPITAL WILL BE THE ACCESS. ROAD.OR.BARBER AVENUE, AND ATTORNEY <br />STEWART FELT IT ULTIMATELY WILL BE OFF BARBER AVENUE. <br />CHAIRMAN WODTKE ASKED IF IT IS NECESSARY FOR THE DOT TO <br />HAVE DEEDS FOR THE 20' OR THE ENTIRE 75' IN ORDER FOR THE DOT TO LET <br />A MINI -CONTRACT. <br />ADMINISTRATOR JENNINGS STATED THE 20' IS SEPARATE AND YOU <br />COULD JUST BUILD ON THE 20', BUT IT WOULD BE MORE LOGICAL TO LET <br />THE CONTRACT FOR THE DRAINAGE YOU ARE GOING TO NEED WHEN YOU BUILD <br />THE WHOLE PROJECT RATHER THAN HAVE TWO SEPARATE OPERATIONS. THIS <br />CANNOT BE DONE, HOWEVER, UNTIL.YOU HAVE ALL THE RIGHTS-OF-WAY. <br />ATTORNEY STEWART INFORMED THE BOARD THAT THE HOSPITAL WOULD <br />LIKE TO HAVE THE DRAINAGE OPEN WHEN THEY ACCEPT THE BUILDING FROM THE <br />CONTRACTOR, HOPEFULLY SOMETIME IN JUNE OR JULY. <br />7 <br />MAR 31977 0 2SAl4 <br />., 63 <br />