Laserfiche WebLink
• <br />ATTACHMENT 2 <br />c:/Jeremiah Johnson projects/Project -Dixie Heights/Kingslake Water Assessment • Cost-Est.xls/CONSTRUCTION L#La 1 Page 1 <br />Indian River County Department of Utilities <br />Project: Kingslake Subdivision <br />Description: FURNSIH AND INSTALL WATER DISTRIBUTION SYSTEM <br />Last Updated: August 22, 2003 <br />Bid <br />Bid <br />Bid Item <br />Estimated <br />Unit of <br />Unit <br />Total <br />Item # <br />Item <br />Description <br />Quantity <br />Measure <br />Price <br />Price <br />MOBILIZATION <br />1 <br />Mobil <br />Mobilization <br />I <br />L.S. <br />$15,000.00 <br />$15,006 <br />WATER DISTRIBUTION <br />2 <br />WM-PVC 2 <br />Furnish & Install 6 -inch PVC Water Main <br />3,855 <br />LF <br />$18.00 <br />$69,390 <br />3 <br />HDD / 6 -inch <br />Furnish & Install 6 -inch HDPE Horizontal Directional Drill <br />70 <br />LF <br />$55.00 <br />$3,900 <br />4 <br />DB / 6 -inch <br />6" Driveway Bore <br />345 <br />LF <br />$40.00 <br />$13,800 <br />5 <br />FIT 1 <br />Fumish & Install - Mech. Restrained It Ductile Iron Fittings <br />0.53 <br />Tons <br />$3,000.00 <br />$1,590 <br />6 <br />FIT 2 <br />Make connection to Exist Mains/ Structure <br />2 <br />EA <br />$1,500.00 <br />$3,000 <br />7 <br />FIT 3 <br />Temp. Water Main Jumper <br />1 <br />EA <br />$800.00 <br />$800 <br />8 <br />WS - sgl. / short <br />Water Service line - Single Short <br />8 <br />EA. <br />$500.00 <br />$4,000 <br />WS - sgl. / long <br />Water Service line - Sing_le Long <br />5 <br />EA. <br />$850.00 <br />$4,250 <br />WS - dbl. / short <br />Water Service line - Double Short <br />I I <br />EA. <br />$600.00 <br />$6.600 <br />WS - dbl. / long <br />Water Service line - Double Long <br />4 <br />EA. <br />$1,050.00 <br />$4,200 <br />9 <br />FHA <br />Fire Hydrant Assembly w/ 6 -inch gate valve <br />3 <br />EA <br />$2,500.00 <br />$7,500 <br />LANDSCAPE RESTORATION <br />10 <br />Sod <br />Lawn Restoration <br />(Topsoil & Sod) <br />(estimated 9' wide replacement) <br />2,570 <br />S.Y. <br />$5.00 <br />$12,850 <br />DEMOBILIZATION ' <br />1I <br />Demob. <br />Demobilization <br />l <br />L.S. <br />$500.00 <br />$500 <br />12 <br />RD <br />Record Drawings <br />t <br />L.S. <br />$500.00 <br />$500 <br />Sub -Total <br />$147,880 <br />10%Contingency <br />$14,788 <br />Total Est. Construction Cost : <br />$162,668 <br />Surveying Services : - <br />$0 <br />Design Services @ <br />7.00% <br />$11,387 <br />Permit Fee - FDEP Water <br />1 <br />LS <br />$500.00 <br />5500 <br />Permitting Services @ <br />0.50% <br />$813 <br />Bidding & Award Services @ <br />0.75% <br />$1,220 <br />Services During Construction @ <br />2.00% <br />$3,253 <br />Administration @ <br />2.50% <br />$4,067 <br />ESTIMATED ASSESSED PROJECT COST : $183,908 <br />ATTACHMENT 2 <br />c:/Jeremiah Johnson projects/Project -Dixie Heights/Kingslake Water Assessment • Cost-Est.xls/CONSTRUCTION L#La 1 Page 1 <br />