My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-168
CBCC
>
Resolutions
>
2000's
>
2008
>
2008-168
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2024 11:45:31 AM
Creation date
9/30/2015 5:44:33 PM
Metadata
Fields
Template:
Resolutions
Resolution Number
2008-168
Approved Date
10/07/2008
Agenda Item Number
10.A.1.
Resolution Type
Confirmation
Entity Name
Indian River Acres
Subject
Special Assessments for water main expansion
Providing for assessment liens to be made of record
Area
129th Place
Supplemental fields
SmeadsoftID
5964
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Intl ian Bit er County Ben ammen I or Ualnin <br />COST ESTIMATE uml CONTRACTOR'S BIO ITEM LIST <br />Project: 129th Place Subtfin irmn Water Asseramene <br />Description: WIFN473. VCPn <br />174u1 -n8 <br />Bid Bid teem EAimamJ unitor <br />Item No. Oeuriei uarthe ---- <br />LA nVn CV5T5 MATERIALCOSTS <br />LaM1nr Unle Tmal LeMn Material Unit Tnlnl MmMal <br />Pdee Mm Price Prim <br />Tuml <br />Priee <br />77 <br />Mobilization Demobilization, MOT <br />I <br />LS <br />$1,000.00 <br />3,000.00 <br />Bidding & Award <br />$5DO <br />00 <br />Ole <br />Install 6" PVC Water Main <br />640 <br />LF <br />$900 <br />5,760.00 <br />Administrative <br />$1,000.00 <br />$3000.00 <br />Bib <br />Instal 14-PVCWater Main <br />140 <br />LF <br />$6.00 <br />84000 <br />$4.10 <br />2624.00 <br />$8 84.00 <br />058 <br />Instal] V HDPE Horizontal Directional Drill <br />80 <br />LF <br />53000 <br />2,400.00 <br />$2.50 <br />350.00 <br />$1190.00 <br />03a <br />Instal] 6"Drive wa Bore <br />50 <br />LF <br />$25.00 <br />$3.00 <br />240 00 <br />$2,640.00 <br />03a <br />Instal] 4" Drive wa pore - <br />30 <br />LF <br />$25.00 <br />1,25000 <br />750.00 <br />$1 50.00 <br />14b <br />Install 12"X6"SS We[Ta w/6"GV&B- <br />1 <br />-, EA <br />$1,200.00 <br />1,200.00 <br />$750.00 <br />07 <br />Install MR)DI Fittin s. <br />025. <br />Tons <br />$4,00000 <br />1000.00' <br />$1500.00 <br />1500.00 <br />$2700.00 <br />17c <br />Install 60GV&B <br />I <br />EA <br />$400.00 <br />$2500 <br />625.00 <br />$1625.00 <br />17b <br />Install 4" GV&E <br />.400.00 <br />.60000 <br />600.00 <br />$1 W0.00 <br />196 <br />- <br />Install FHA w/60GV&B <br />1 <br />EA <br />530000 <br />300.00 <br />450.00 <br />450.00 <br />$750.00 <br />16e <br />Install l-1/2"PE Water Service DBL Short <br />1 <br />EA <br />$1,200.00 <br />1,20000 <br />240000 <br />240000 <br />$3600.00 <br />16m <br />Install 1-112eRE Water Service DBL Lon) <br />3 <br />EA <br />$60000 <br />80000 <br />550.00 <br />550.00 <br />$1,350.00 <br />16a <br />Install I"PE Water Service SGL Shan <br />2 <br />EA <br />$1,100.00 <br />330000 <br />600.00 <br />1600.00 <br />$S IOO.UO <br />16i <br />Install I"PE Water Service SGL Lon <br />EA <br />5800.00 <br />1600.00 <br />30000 <br />600.00 <br />$2,200.00 <br />24b <br />Install Tem 2- Jumper <br />EA <br />$1,10000 <br />1,10000 <br />300.00 <br />300.00 <br />$1400.00 <br />I <br />EA <br />$40000 <br />400.00 <br />70000 <br />]00.00 I <br />51100.00 <br />Est. Construction Cost for Assessment Project <br />10% Contingency <br />$25,300 $12,739.00 $38,03900 <br />$38,039.00 <br />3,804.00 <br />ASSESSMENT ESTIMATED CONSTRUCTION COST $41,843.00 <br />Surveying <br />$2,500.00 <br />Record Drawing <br />$1500.00 <br />Design <br />$1,000.00 <br />Bidding & Award <br />$5DO <br />00 <br />Permitting <br />$500.00 <br />Construction Services <br />$1,00000 <br />Administrative <br />$1,000.00 <br />ESTIMATED TOTAL ASSESSMENT PROJECT COST $49,843.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.