My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-168
CBCC
>
Resolutions
>
2000's
>
2008
>
2008-168
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2024 11:45:31 AM
Creation date
9/30/2015 5:44:33 PM
Metadata
Fields
Template:
Resolutions
Resolution Number
2008-168
Approved Date
10/07/2008
Agenda Item Number
10.A.1.
Resolution Type
Confirmation
Entity Name
Indian River Acres
Subject
Special Assessments for water main expansion
Providing for assessment liens to be made of record
Area
129th Place
Supplemental fields
SmeadsoftID
5964
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDLAN RIVER COUNTY <br />Department of Utility Services <br />Memo <br />To: Dan Chastain, Assessment Manager <br />From: Gordon E. Sparks, P.E., Environmental Engineer <br />Thru: Mike Hotchkiss, P.E., Capital Projects Manager 70 <br />CC: W. Eric Olson, Director <br />Date: July 30, 2008 <br />Re: IRC — 129th Place Subdivision Water Assessment, UCP # 2953 <br />WIP #473-169000-0 <br />Cost Estimate for Assessment <br />Attached is the estimated cost to install the water main and appurtenances for the 129h Place Subdivision <br />Water Assessment including Engineering, Permitting, Surveying, etc. 1 have also included the estimated cost <br />of a loop extension of the water main on Indian River Drive with 6" main. The cost is assumes conventional <br />installation by trench construction. If rip rap or other heavy materials are encountered that would preclude <br />installation by conventional trenching methods, this loop extension will be eliminated from the project and <br />only the water 6" and 4" water main on 129`" Place will be constructed, thus reducing the cost of the <br />assessment project. <br />My cost estimate for the total <br />construction is $49,843.00; <br />therefore, <br />I recommend $50,000.00 be used for the <br />Assessment Roll. <br />GES/ges <br />Page I <br />FdUtilities\UTfLrrY- ENGINEERING\Projects - Assessment Projects\129TH PL A PORTION OF RJDIAN RIVER ACRESW I - Memo to Dan Cost <br />Estimate for Assessm-nt 7-30-08.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.