Laserfiche WebLink
M <br /> Indian River County Department of Utilities w <br /> Project: Crystal Sands Water Utility Construction Cost Estimate Prepared By: H.Mehta <br /> UCP No.2507,WIP No.473-169000-05510 Draft Estimate Date: 8/15/2005 r \ <br /> Final Estimate Date: 8/29/2005 v <br /> [� <br /> Item No. Description Estimated Quantity Unit of Measure Unit Price Total Price <br /> 1 Mobilization/Demobilization 1 LS $ 15,000 $ 15,000 -/ <br /> 2 Surveying Services 1 LS $ 3,800 $ 3,800 <br /> 3 6"HDPE Directional Drill Water Main(Total 3 at 50 ft each:1 for 47th Place,1 for 48th Street&1 for 48th Place)* 150 EA $ 70 $ 10,500 <br /> 4 Furnish&Install 12"x 6"Tapping Sleeve&Valve* 3 EA $ 3,000 $ 9,000 <br /> 5 Furnish&Install 6"GV&B,APPLICABLE IF USING EXISTING STUB OUT 3 EA $ 800 $ 2,400 <br /> 6 Furnish&Install 6"PVC Water Main&Surface Restoration 2,000 LF $ 14 $ 28,000 <br /> 7 Furnish&Install 6"PVC Driveway Bores 270 LF' $ 30 $ 8,100 <br /> 8 Furnish&Install Fire Hydrant,Gate Valve&Box 3 EA $ 3,000 $ 9,000 <br /> 9 Furnish&Install 1"PE Single Short Water Service 7 EA $ 500 $ 3,500 <br /> 10 Furnish&Install 1"PE Single Long Water Service(including 2"sleeve) 7 EA $ 600 $ 4,200 <br /> 11 Furnish&Install 1-1/2"PE Double Short Water Service 9 EA $ 700 $. 6,300 <br /> 12 Furnish&Install 1-1/2"PE Double Long Water Service(including 2"sleeve) 7 1 EA $ 750 $ 5,250 <br /> 13 Lawn Restoration(Topsoil&Sod,in hind) 1,730 LF $ 5 $ 8,650 <br /> 14 Record Drawings;As-Built Survey 1 LS $ 3,000 $ 3,000 <br /> 15 SUBTOTAL= $ 116,700 <br /> 16 Contingency,10 Wof Item No.15 10 % $ 11,670 <br /> 17 Design Services,7%of Item No.15 7 % $ 8,169 <br /> 18 Permitting Fee-FDEP Water 1 LS $ 250 $ 250 <br /> 19 Permitting Services,1%of Item No.15 1 % $ 1,167 <br /> 20 Bidding and Award Services,2%of Item No.15 2 % $ 2,334 <br /> 21 Services During Construction,2%of Item No.15 2 % $ 2,334 <br /> 22 Adminjstrative Services,2%of Item No.15 2 % r $ 2,334 <br /> 23 TOTAL ESTIMATED PROJECT COST(Items 15 through 22)_ $ 144,958 <br /> *APPLICABLE ONLY IF IT IS NOT FEASIBLE TO CONNECT WITH EXISTING STUB OUT BUDGET REQUESTED= $ 145,000 <br /> The unit price bid for famishing and installation/construction of water main shall include,but is not limited to,utilities exploration,coordination with any permitting agencies,trenching,removing,d <br />isposing of and replacing unsuitable(i.e. <br /> plastic or organic)material,dewatevng,installation of pipe and all appurtenances,trace wires,sleeves,fittings,restrainers, filling trench,soil compaction, disinfection,flushing,sampling,testing(inc <br />ludes providing temporary jumper or anoth <br /> approved method for filling water main,disinfection,and flushing),irrigation repair, removal,disposition and replacement of surface over trench to pre-construction conditions,and traffic <br />maintenance/control:The PVC pipe shall be C-900.Al <br /> materials and installation shall be per Indian River County Utility Standards and Specifications unless otherwise noted in the bid documents.Contractor.will be provided with a copy <br />of construction plans in AutoCAD format,which include <br /> location reference to state plane coordinates to use in preparing Record Drawings. <br /> Crystal Sands-08 29 05 LDGR <br /> FINAL Engineer's Estimate for Crystal Sands Water Assessment 08 29 05-Is Date Pri ted: 8/29/2005 <br />