My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-010
CBCC
>
Resolutions
>
2000's
>
2006
>
2006-010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2017 4:10:31 PM
Creation date
9/30/2015 4:33:52 PM
Metadata
Fields
Template:
Resolutions
Resolution Number
2006-010
Approved Date
01/24/2006
Agenda Item Number
11.J.1.
Resolution Type
Utilities
Entity Name
BCC
Subject
Water Main Extension Lakewood
Area
West side of 27th Ave. Lakewood Terrace Subdivision
Archived Roll/Disk#
3129
Supplemental fields
SmeadsoftID
1800
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A <br />1. <br />33 'Indian River County Force Account, 10% of Item 32 I 10% I % S29,385.00 <br />32 Subtotal Water Facilities <br />25 'Furnish & Install I-1/2" PE Double Long Water Service (w/sleeve) 25 EA S800.00 <br />A <br />W N <br />- <br />O <br />A <br />W <br />O <br />O <br />CO <br />CO J <br />1 _Mobilization (See Section 01025) 1---1-LS I I 15,000.001 <br />Item Estimated Unit of Unit Total <br />Item No. Description Quantity Measure Price Price <br />• <br />Total Water Facilities Construction Cost (Bid Estimate) I 1 I 1 5323,235.001 <br />!Furnish & Install 1-1/2" PE Double Short Water Service <br />Furnish & Install 1" PE Single Short Water Service <br />Furnish & Install 1" PE Single Long Water Service (w/sleeve) <br />VI <br />0 <br />0 <br />F <br />U <br />w <br />Ot, <br />0 <br />!Furnish & Install DIP Fittings 3.00 T TONS 55,500.00 <br />!Lawn/ROW Restoration (Topsoil & Bahia Sod) <br />Furnish & Install Fire Hydrant Assembly w/ 6" GV&B <br />!Fumish & Install 6" GV&B <br />!Furnish & Install 6" PVC Water Mair Driveway Bor) <br />!Furnish & Install 8" HDPE Dir. Drill Water Main <br />!Furnish & Install 6" PVC Water Main <br />!Furnish & Install 6" HDPE Dir. Drill Water Main <br />pq <br />8 <br />N <br />O. <br />N <br />O. <br />p <br />O <br />N <br />O <br />Wr <br />J �• <br />TOTALPROJECT COST ESTIMATE! 5354,735.001 <br />TOTAL ESTI <br />.0 <br />a <br />O <br />o <br />00'OOLS <br />00'0095 <br />0 <br />H" <br />00 <br />O <br />0 <br />�n <br />P <br />O <br />0 <br />H <br />O <br />0 <br />H <br />Os <br />O <br />00'o5S <br />00.0ZS <br />Administration <br />Construction Services <br />ro <br />8 <br />n <br />Bidding & Award <br />Design] <br />Record Drawings <br />01 <br />M <br />W <br />pO <br />O <br />20,000.001 <br />—. <br />w <br />O <br />O <br />400.001 <br />4,900.00 <br />H <br />O <br />O <br />— <br />P <br />O <br />O <br />— <br />CO <br />O <br />O <br />O <br />33,600.001 <br />—•N <br />O <br />O <br />$ <br />O <br />O <br />o <br />8 T0 <br />p O <br />0 <br />- <br />— N <br />O <br />O O <br />o 0 <br />y <br />O <br />O <br />49 <br />© <br />O <br />O <br />r <br />O <br />O <br />r <br />O <br />O <br />69 <br />0 <br />O <br />O <br />0 <br />O <br />O <br />O <br />Oo <br />01EA <br />N <br />W <br />
The URL can be used to link to this page
Your browser does not support the video tag.