My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/5/1977 (2)
CBCC
>
Meetings
>
1970's
>
1977
>
10/5/1977 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:28:41 AM
Creation date
6/11/2015 9:03:23 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
10/05/1977
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
j' SECTION B — COMPENSATION FOR BASIC ENGINEERING SERVICES <br />The OWNER shall compensate the ENGINEER for basic engineering services not to exceed $ 26,526.00 or as <br />shown in Attachment I. <br />When Attachment I is used to establish compensation for basic services the construction costs on which compensation <br />Is determined shall exclude legal fees, administrative costs, engineering fees, land rights acquisition costs, water costs, <br />and interest expense incurred during the construction period. The compensation for basic engineering services shall <br />be payable as follows: <br />1. The sum of None I Dollars ($ 0.00 after the review of the pre- <br />liminary engineering report by the FmHA and acceptance by the OWNER. <br />2. A sum which together with the specific sum set forth in Section B-1 above equals seventy percent (70%) of the <br />total compensation payable after completion and submission of the final drawings, specifications, cost estimates, <br />and contract documents, and the acceptance of the same by the OWNER and FmHA. <br />3. A sum equal to ten percent (107c) of the total compensation payable immediately after the construction contracts <br />are awarded. <br />4. A sum equal to twenty percent (209o') of the total compensation will be paid on a monthly basis for general engineering <br />inspection of the contractor's work during the construction period on percentage ratios identical to those approved <br />by the ENGINEER as a basis upon which to make partial payments to the contractor(s). However, final payment <br />under this paragraph and of such additional sums as are due the ENGINEER by reason of any necessary adjustments <br />in the payment computations will be in an amount so that the aggregate of all sums paid to the ENGINEER will <br />equal one hundred percent (1009o') of the basic compensation. Final payments shall not be made until it is determined <br />that all services required by this Agreement have been completed except for the services set forth in Section A-21 <br />hereof. <br />The compensation for engineering services shall be: <br />07be total sum of $ 26,526, including services under Section C. <br />Established by Attachment I. <br />SECTION C — COMPENSATION FOR DETAILED RESIDENT CONSTRUCTION INSPECTION <br />AS SET FORTH IN SECTION A-15 <br />When the engineer provides detailed resident construction inspection, he will, prior to the preconstruction con- <br />ference, submit a resume of the construction inspectors' qualifications, anticipated duties and responsibilities for approval <br />by the OWNER and FmHA. The OWNER agrees to pay the ENGINEER for such service in accordance with the schedule <br />set out in Attachment I. The ENGINEER will render to OWNER for such services an itemized bill, separate from any <br />other billing, at the end of each month, for compensation for such services performed hereunder during such month, the <br />same to be due and payable by OWNER to the ENGINEER 'on or before the 10th day of the following month. <br />a <br />'x e <br />nox 31 PAGE 214 t <br />OCT 5 1977 <br />
The URL can be used to link to this page
Your browser does not support the video tag.