My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/19/1977 (2)
CBCC
>
Meetings
>
1970's
>
1977
>
10/19/1977 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:28:41 AM
Creation date
6/11/2015 9:05:04 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
10/19/1977
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />over the same term. Appendix B shows this financial analysis. The average increase <br />in cost, over an eight year period, would be $28,000. This increase in expenditure <br />(even if absolutely no compensating cost reductions occurred) would buy us an <br />extension in capability shown at the right hand column of Appendix A. <br />This increase in expenditure would probably now really be reached. It is my <br />best estimate that even if we attempt no new applications, we would still need <br />upgrades to our present computer. The Analysis at Appendix C shows what the <br />additional cost would be if the present model was upgraded in October of 1980 by <br />increasing data storage capacity and printer speed. The increased cost in this <br />eventuality would be an average of $8,500 per year over an eight year period. <br />It is my personal opinion that, ignoring possibilities of cost reduction or <br />outside revenue, the analysis shown at Appendix C is the more realistic estimate. <br />It would probably not be realistic to upgrade our current computer now to undertake <br />the County Planning and Utility Billing and Collecting functions. As shown at <br />Appendix D, this option would entail the upgrades described above beiiig needed as <br />early as October of 1978. This would make the lease of our present model computer <br />even more expensive than the lease/purchase of the larger model. <br />In case the lease/purchase option is considered, the possibility of changing <br />vendors rather than upgrading our present I.B.M. System/3 computer has also been <br />carefully investigated. My findings in previous analyses dealing with this <br />subject have been re -confirmed. There is no viable alternative which offers <br />sufficient compatibility to avoid a major and costly conversion. <br />In Fiscal Year 1973-74 we spent $1,708,000 on direct personnel expense. Our <br />budget for the 1977-78 Fiscal Year is $3,247,000, an increase in four years of 90%. <br />These increases in personnel expense are the resulta.of several factors. Each year <br />our citizens demand and expect additional and improved services. An increased <br />burden has been placed on the County Court System. State and Federal agencies <br />continue to increase their reporting requirements. As our population increases the <br />-5- <br />d <br />0 <br />CT J 91977 <br />
The URL can be used to link to this page
Your browser does not support the video tag.