My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/8/1978
CBCC
>
Meetings
>
1970's
>
1978
>
3/8/1978
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:40:06 AM
Creation date
6/11/2015 10:08:43 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
03/08/1978
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br />.IN FURTHER DISCUSSION, IT WAS NOTED THAT THE FIRE TRUCKS <br />ARE IN THE COUNTY'S NAME AND SHOULD BE COVERED BY INSURANCE AUTOMATICALLY. <br />THE BOARD AGREED THEY HAD NO PROBLEM WITH PAYING PART OF THE REPAIR <br />BILL AS REQUESTED, BUT WANTED TO MAKE SURE THAT THIS DOES NOT HAPPEN <br />.IN THE "FUTURE. <br />CHAIRMAN WODTKE REQUESTED THE ADMINISTRATOR TO LOOK INTO THIS <br />SITUATION. <br />ON MOTION BY COMMISSIONER DEESON, SECONDED BY COMMISSIONER <br />SCHMUCKER, THE BOARD UNANIMOUSLY APPROVED ASSUMING HALF OF THE COST, <br />OR A TOTAL OF $300.00, FOR REPAIRS TO THE 1975 FELLSMERE FIRE TRUCK, <br />THE FUNDS TO BE TAKEN FROM FEDERAL REVENUE $HARING FUNDS. <br />ADMINISTRATOR .JENNINGS DISCUSSED WITH THE BOARD THE POSSIBILITY <br />OF USING AN AIR°CURTAIN DESTRUCTOR AT THE LANDFILL. HE EXPLAINED THAT <br />AN "AIR CURTAIN DESTRUCTOR" IS A TYPE OF BURNER -BLOWER WHERE AIR IS <br />BLOWN INTO A,REFRACTOR-TYPE PIT. THE ADMINISTRATOR FELT SUCH A PIECE <br />OF EQUIPMENT WOULD MORE THAN PAY FOR ITSELF BY CUTTING DOWN ON THE <br />AMOUNT OF MATERIALS WE HAVE TO COVER IN THE LANDFILL SITE. HE NOTED <br />THAT IT WOULD ALSO REDUCE THE COST OF DISPOSAL OF CERTAIN TYPES OF <br />MATERIALS AND, CONSEQUENTLY, COULD RESULT IN A LOWERING OF RATES ON <br />THESE MATERIALS. HE FELT SUCH A DESTRUCTOR WOULD BE A GREAT ASSET TO <br />THE LANDFILL OPERATION AND ESTIMATED IT WOULD COST BETWEEN $35,000 T0. <br />$110,000. ADMINISTRATOR JENNINGS CONTINUED THAT WE WOULD HAVE TO PRE- <br />PARE PLANS AND ADVERTISE FOR BIDS AND ALSO APPLY FOR A PERMIT FROM <br />THE DER. HE INFORMED THE BOARD THAT HE HAS DLSCUSSED THE USE OF -AN <br />AIR CURTAIN DESTRUCTOR WITH THE DER,AND THEY AGREED IT WOULD BE A REAL <br />ASSET TO OUR OPERATION AS WELL AS PROMOTE THE USE OF SUCH EQUIPMENT IN <br />OTHER LANDFILLS IN THE STATE. HE PRESENTED TO THE BOARD A LETTER <br />FROM THE DISTRICT MANAGER OF THE DER EXPRESSING THEIR INTEREST IN AND <br />APPROVAL OF THE USE OF AN AIR CURTAIN.DESTRUCTOR, AS FOLLOWS: <br />17 <br />�y <br />BQDK PAGE 99 <br />l <br />
The URL can be used to link to this page
Your browser does not support the video tag.