Laserfiche WebLink
BID ANALYSIS SUMMARY <br />PHASE II-GIFFORD AREA WATER SYSTEM RENOVATION <br />ENGINEER'S JOB NO. 5675A <br />JUNE 12, 1978 <br />A. Total Base Bid Received: $57,318 (Driveways, <br />I <br />Inc.) <br />$ 7,000 (Subcontract- <br />Pitometer Assoc.) <br />TOTAL CONSTRUCTION COST $64,318 <br />Original <br />Actual Bid <br />Estimate <br />Price <br />B. Original Schedule of Work <br />1. Connect to Phase I -System 2 -Places $ 800 <br />$ -1,750 <br />2. Leakage Survey 10,000 <br />7,0001 <br />3. Repair Leaks 10,000 <br />51000 <br />4. Flush Distribution System 2,000 <br />2,500 <br />5. Remove/Rebuild/Reinstall 5/8 Meters 440 11,2502 <br />32,560 <br />6. -Relocate Meter/Box 2,000 <br />2,000 <br />'DOTAL $36,050 <br />$ 50,810 <br />Leakage Survey subcontracted to Engineers,. not included in Bid. <br />2.Original Estimate error, did not include removing & reinstalling <br />meters. <br />Page 1 of 2 <br />E�OK <br />35 PAGE IN <br />JUN 16 197 <br />