My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/16/1978
CBCC
>
Meetings
>
1970's
>
1978
>
6/16/1978
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:40:07 AM
Creation date
6/11/2015 10:18:21 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Special Call Meeting
Document Type
Minutes
Meeting Date
06/16/1978
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• M <br />J <br />i <br />} <br />- i <br />i <br />BID ANALYSIS SU1*1ARY (CONT -0) <br />PHASE II-GIFFORD AREA MATER SYSTEM RENOVATION � <br />ENGINEER'S JOB N0. 5675A <br />C. Additional Items of Work included in Total Base Bid. ` <br />Items1 <br />Cost Per Bid Price <br />I. New 5/8 Meters $ 2,610 � <br />�. New % & 2 " Meter 500 <br />3. Miscellaneous Materials Angle Stop, <br />Corporation Stops, Etc. g1,700 <br />4. New Meter Boxes 540 <br />5. 3 -New N tv Nydr-ants 2,700 <br />i <br />6. 1 -Connection to Phase I System <br />@ 28th St. & 43rd Ave.. 750 <br />7. New 2" PVC Main to Replace Existing <br />3/4" on 25th Ave. 2,958 <br />8. New Service Line for New Connection 1,750 <br />TOTAL ADDITIONAL $ 13,508 <br />TOTAL BID A & B $50,810 + 13,508= $64,318 <br />1Cost total per applicable Bid Items. <br />i <br />Page 2 of 2 <br />JUN 161978 BOOK 35 pace . <br />. a <br />
The URL can be used to link to this page
Your browser does not support the video tag.