Laserfiche WebLink
• M <br />J <br />i <br />} <br />- i <br />i <br />BID ANALYSIS SU1*1ARY (CONT -0) <br />PHASE II-GIFFORD AREA MATER SYSTEM RENOVATION � <br />ENGINEER'S JOB N0. 5675A <br />C. Additional Items of Work included in Total Base Bid. ` <br />Items1 <br />Cost Per Bid Price <br />I. New 5/8 Meters $ 2,610 � <br />�. New % & 2 " Meter 500 <br />3. Miscellaneous Materials Angle Stop, <br />Corporation Stops, Etc. g1,700 <br />4. New Meter Boxes 540 <br />5. 3 -New N tv Nydr-ants 2,700 <br />i <br />6. 1 -Connection to Phase I System <br />@ 28th St. & 43rd Ave.. 750 <br />7. New 2" PVC Main to Replace Existing <br />3/4" on 25th Ave. 2,958 <br />8. New Service Line for New Connection 1,750 <br />TOTAL ADDITIONAL $ 13,508 <br />TOTAL BID A & B $50,810 + 13,508= $64,318 <br />1Cost total per applicable Bid Items. <br />i <br />Page 2 of 2 <br />JUN 161978 BOOK 35 pace . <br />. a <br />