Laserfiche WebLink
n <br />: SVERDRUP & PARCEL AND ASSOCIATES. INC. <br />AND <br />' SEINDORF AND ASSOCIATES. INC. <br />MJ0INT VENTURZ) <br />Mr. Jack G. Jennings <br />County Administrator <br />Indian River County <br />County Courthouse, Room 115 July 17, 1978 <br />Vero Beach, Florida 32960 <br />Re: Indian River County Water System <br />EDA Project.04-51-20869 <br />Dear -14r. Jennings: <br />Ralph Eng of Sverdrup & Parcel and Associates, Inc., and I have reviewed the Widell <br />Associates, Inc., letter of July 10, 1978, to Indian River County, in which they <br />requested a 62 calendar day time extension to their contract for the above subject <br />project. The four principal reasons cited in their letter as causes for delay are <br />as follows: <br />1. i•ailure to perform and subsequent cancellation of Minority Systems, Inc.., in <br />their subcontract with Widell Associates, Inc. <br />2. Delayed shipment of pumping equipment and auxiliary engine by the manufacturer. <br />3. Workers strike in March 1978 by the BIF (Basic.In Flow) Company delaying ship- <br />Inent of system instrumentation. <br />4. Delay in electrical work and instrumentation installation at the elevated <br />water storage tank caused by delay of POM-Hydrostorage in starting tower <br />erection. <br />The records show that a 62 -day period lapsed between the time Minority Systems, <br />Inc., requested cancellation of their subcontract with Widell Associates, Inc., and <br />the date Cad W. Brown, the succeeding minority contractor, entered into subcontract <br />with Widell Associates, Inc., for construction of the pumping station. <br />During the time, however, when Widell Associates, Inc., was seeking and negotiating <br />with various minority contractors, no work of any kind was performed by Widell <br />Associates, Inc., from March I8th through March- 31st. <br />The pumps.for the pump station have arrived and were installed on July 11, 1978, <br />but the auxiliary engine has not been shipped yet. It is supposed to be shipped <br />by the end of.Juiy and can be easily installed within a week after arrival. <br />The BIF strike is now over but the scheduled shipping dates for the Chronoflo <br />transmitter and receiver are September 22nd and October 16th, respectively. Widell <br />Associates, Inc., is currently trying to expedite shipment. <br />Erection of the water tower is supposed to be completed by the end of July, so that <br />Commencement of the electrical work and instrumentation by Widell Associates, Inc., <br />Should not be as delayed as they anticipated. <br />We, therefore, recommend the following: <br />1. All work under contract including testing, sterilization, and start up without <br />instrumentation shall be completed by no later than Friday, August 25, 1978. <br />This is an extension of 53 calendar days to the contract time for Widell <br />Associates, Inc. <br />2. Shipment, installation, and operation'of all instrumentation will have an in- <br />definite extension but no later than December 1, 1978, with the following con- <br />ditions: <br />A. Widell Associates, Inc., shall maintain their performance and payment <br />bonds, and insurance until final acceptance of the project. <br />i3. •The County shall operate the system manually from the time it is completed <br />.without the instrumentation; the total calendar days of manual operation <br />will be subtracted from the one year warranty period. <br />C. The warranty period for the instrumentation shall be one year from the date <br />of final acceptance of the project. <br />3. Widell Associates, Inc., may be assessed liquidated damages of $200 per calen- <br />.dar day after August 25, 1978, if all the work under the contract excluding <br />instrumentation is not completed. <br />We request that the Indian River County Commissioners review our recommendations <br />at their regularly scheduled July 19, 1978, meeting, and notify Widell Associates, <br />Inc., of their decision regarding the extension of contract time as soon as possible <br />following the meeting. <br />Sincerely, - <br />Richard B. Votapka <br />Beindorf and Associates, Inc. <br />