Laserfiche WebLink
{ <br />f <br />i <br />f <br />r <br />i <br />a <br />t <br />ESTIMATED PROJECT COST SLYMMARY <br />PHASES I AND II - GIFFORD AREA AND INDIAN RIVER COUNT`I WATER SYSTEM <br />NOVEMBER 7, 1978 <br />ENGINEER'S JOB NOS. 5276, 5675, 5675A, B, C, D, E, F, AND G <br />Estimated Amount <br />Items <br />To Complete <br />1. Phase I - County Water System- <br />UDU Purchase <br />A. UDU Purchase <br />$ 75,000.00 <br />B. Pump Station/Transmission Line <br />Construction ($228,260 Bid Price) <br />224,137.55 <br />C. Elevated Tank Construction <br />1. -Bid Price <br />$336,500 <br />Liq. Damages <br />(20,600) <br />Chg. Order No. 1 <br />(11000) <br />Water Allowance <br />(736) <br />314,164.00 <br />D. Engineering <br />1. Basic Fee <br />$ 26,526 <br />2. Additional Services <br />13,000 C0 <br />39,526.00 <br />Total Phase I <br />$ 652,827.55 <br />2. Phase II - Gifford Area - Water <br />System Renovation, Water System <br />Extension and Sewer System <br />Renovation <br />A. Water System Renovation <br />' <br />` t 1. Leakage Survey <br />$ 7,646.13 <br />2. Renovation Construction <br />89,51 .00 <br />3. Engineering <br />1 <br />NOV 15 1978 <br />{i <br />,J <br />284t <br />