Laserfiche WebLink
(3) <br />t= , <br />(5) Based on Proposed Extension and. Other Costs (See Attached) <br />{i <br />3. Funds Available <br />f <br />A. Phase I/II (Existing $1,270,000.00 <br />B. Requested (Fu MA) 553,650.00 <br />Total $1,823,650.00 <br />4 <br />k <br />NOV 151978 <br />I . <br />2 <br />BOOK <br />a) Basic $ 12,828 <br />C4G) <br />b) Additional Services 4,600 <br />$114,592.13 <br />B. <br />Water System Extension 553,650.00 Cs) <br />C. <br />Sewer System Renovation <br />1. Construction $250,000 <br />2, Engineering @ 172 42,500 <br />3. Contingency @ 7% 20,500 <br />313,000.00 ' <br />D. <br />Legal/Administration 10,200.00 <br />E. <br />Interest During Construction 19,100.00 �¢ <br />Total Phase II $1,010,542.10 <br />Total Phases I and II $1,663,369.60 <br />(1) <br />Additional Services for Engineering Inspection and Project Administration <br />from End of Contract Date to Completion of Construction. <br />(2) <br />Base Bid $57,318 Pius Additional Work. <br />• <br />(3) <br />Based on Total Construction Cost (Estimated) <br />!:FI <br />(4) <br />Additional Services for R/W Determination and Inspection. <br />t= , <br />(5) Based on Proposed Extension and. Other Costs (See Attached) <br />{i <br />3. Funds Available <br />f <br />A. Phase I/II (Existing $1,270,000.00 <br />B. Requested (Fu MA) 553,650.00 <br />Total $1,823,650.00 <br />4 <br />k <br />NOV 151978 <br />I . <br />2 <br />BOOK <br />