My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/15/1978
CBCC
>
Meetings
>
1970's
>
1978
>
11/15/1978
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:40:09 AM
Creation date
6/11/2015 10:45:41 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
11/15/1978
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' PROPOSED PROJECT SUMMARY <br />FOR INDIAN RIVER COUNTY <br />GIfFORD 14ATER DISTRIBUTION EXTENSION <br />JOB NO. 5675B <br />OCTOBER 13, 1978 <br />I. TOTAL PROJECT COST <br />A. Construction $ 444,000 <br />Contingency @ 6% 27,000 <br />TOTAL $ 471,000 <br />B. Technical Services (Total 13%, Basic, <br />Residential Inspection, Additional Services) 61,650 <br />C. Legal & Administration 1 1/4% 7,000 <br />D. Interest During Construction 7,000 <br />E. Capitalized Interest - i year 7,000 <br />TOTAL PROJECT COST $ 553,650 <br />II. COST SHARING <br />A. Potential Connections = 375 <br />Assume 80% Connections = 300 <br />B. Rate Schedule $7.10 1st 2000 Gal <br />1.50/1000 gal -over 2000 gal <br />Average Consumption @ 3500 gal/mth <br />Average Rate: $9.35/month <br />C. Therefore: Income @ $9.35/mth (12) (300) _ $33,660/yr. <br />Less 10% Reserve = 3,500/yr. <br />Less 0&M @ $4.50/mth/conn. = 16,200/yr. <br />$13 960/yr for Loan <br />$13,960/0.05928 (5% 38 yr.) _ $235,492 Loan - <br />D. Total Project Cost - $553,650 <br />Loan- 235,492 <br />Grant 318,158 <br />3 <br />OV 15.1978 <br />r <br />E <br />r <br />WL <br />Am 'ham <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.