My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/15/1978
CBCC
>
Meetings
>
1970's
>
1978
>
11/15/1978
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:40:09 AM
Creation date
6/11/2015 10:45:41 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
11/15/1978
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENGINEER BEINDORF THEN DISCUSSED THE SEWAGE SYSTEM. HE NOTED <br />THAT THE $210,000 SHOWN IN THE ORIGINAL BUDGET WOULD BE THE COST OF <br />TAKING THE SEWAGE TO THE CITY OF VERO BEACH, HE REPORTED THAT SINCE <br />DECEMBER OF LAST YEAR WE HAVE BEEN DEALING WITH THE CITY TRYING TO WORK <br />OUT VARIOUS ROUTES TO TIE IN TO THEIR LINES WITHOUT GOING ALL THE WAY <br />TO THE TREATMENT PLANT. FINALLY, IN EARLY OCTOBER OF THIS YEAR, AFTER <br />PAYING FOR ONE STUDY, IT WAS DETERMINED WE COULD NOT TIE INTO THE AIR— <br />PORT, AND THE ONLY OTHER PLACE WOULD BE AT THE HOSPITAL SITE. HE INFORMED <br />THE BOARD THAT THERE WERE ABOUT TEN OR ELEVEN CONDITIONS TIED INTO THAT <br />SITE, AND AS THESE CONDITIONS WERE STUDIED, IT BECAME OBVIOUS THAT WE <br />WERE GOING TO GO OVER THE $210,000 BY A CONSIDERABLE AMOUNT — POSSIBLY <br />UP TO ABOUT $380,000. IN ADDITION, WE HAVE BEEN TRYING TO SECURE FROM <br />THE CITY THE COST OF TREATING THE.SEWAGE, AND HAVE BEEN GETTING NUMEROUS <br />COSTS; WHICH INDICATE THAT WE ARE GOING TO BE MUCH OVER WHAT WE ESTIMATED <br />A YEAR AGO, ENGINEER BEINDORF STATED THAT WE HAVE A POSSIBILITY OF <br />ACQUIRING A 100,000 GPD TREATMENT PLANT, POSSIBLY AT NO CHARGE, SO BASED <br />ON THIS, WE LOOK TOWARDS A TEMPORARY SOLUTION. HE CONTINUED THAT IF <br />WE WERE ABLE TO OBTAIN THIS TREATMENT FACILITY FREE OF CHARGE, THEN WE <br />HAVE THE POSSIBILITY OF THE GIFFORD SEWAGE TREATMENT COSTING $250,000 <br />TO $260,000 IN LIEU OF THE $313,000 SHOWN IN THE REPORT. <br />ENGINEER BEINDORF NEXT REPORTED THAT THEY HAD ORIGINALLY <br />ALLOWED $128,000 FOR EXTENSION OF THE WATER DISTRIBUTION SYSTEM, AND <br />ARE NOW ESTIMATING $553,000. HE EXPLAINED THAT THIS TIME THEY ARE TRYING <br />o TO SET UP THE SYSTEM WITH METERS FOR EVERY HOUSE AND TO BEEF UP LINES <br />FROM THE ELEVATED STORAGE TANK TO REACH FURTHER AREAS ACROSS U.S. 1. <br />THEY HAVE ALSO INCLUDED HYDRANTS FOR FIRE PROTECTION, AND, OF COURSE, <br />COSTS HAVE INCREASED FROM A YEAR AGO. ENGINEER BEINDORF EXPLAINED THAT <br />IN THE BIDDING THEY SET UP AREAS A THROUGH G, AND ANY OF THESE COULD BE <br />DELETED IF DESIRED. <br />ENGINEER BEINDORF NOTED THAT ABOUT A MONTH AGO THE BOARD <br />AUTHORIZED THE ENGINEERS TO PREPARE AN APPLICATION PACKAGE TO FHA FOR <br />AN ADDITIONAL LOAN AND GRANT, AND THEY HAVE NOW PUT TOGETHER SUCH A <br />PACKAGE. IN ORDER TO GET THE $318,000 GRANT, THEY HAVE SUGGESTED THE <br />COUNTY BORROW $235,000. HE NOTED THAT THIS WOULD SUPPLY MONEY TO RENOVATE <br />46 <br />em 37 ��: <br />NOVA 51978 <br />
The URL can be used to link to this page
Your browser does not support the video tag.