Laserfiche WebLink
COMMISSIONER Loy STATED THAT SHE RECEIVED THE SAME PROPOSAL <br />FROM A THIRD BONDING COMPANY. MORE DISCUSSION FOLLOWED REGARDING <br />ALTERNATIVES FOR SUPPLYING HOUSING. <br />ON MOTION BY COMMISSIONER LYONS, SECONDED BY COMMISSIONER <br />LOY, THE BOARD UNANIMOUSLY AGREED TO DEFER CONSIDERATION OF THE HOUSING <br />AUTHORITY AND THE OTHER THREE BONDING PROGRAMS UNTIL THE FIRST MEETING <br />IN .JANUARY. <br />ENGINEER RALPH ENG CAME BEFORE THE BOARD TO REVIEW THE BIDS <br />RECEIVED ON PHASE II OF THE GIFFORD WATER SYSTEM EXTENSION, HE NOTED <br />THAT THERE WAS AN ERROR IN TRANSPOSITION.OF FIGURES IN CHAPMAN'S BID <br />ON THE ALTERNATE AND GAVE THE BOARD THE CORRECTED FIGURES. HE. <br />EXPLAINED THAT THE ONLY DIFFERENCE BETWEEN THE BASE BID AND THE ALTERNATE <br />BID WAS THAT THE ALTERNATE BID ALLOWED THE USE OF SOME PVC PIPE. HE <br />NOTED THERE IS ONLY A DIFFERENCE OF $16,000 BETWEEN THE BASE BID AND <br />THE ALTERNATE BID, AND THEY, THEREFORE, WOULD RECOMMEND THE BASE BID <br />BE ACCEPTED AS IT WOULD BE BETTER TO HAVE THE DUCTED IRON PIPE ALONG, <br />THE MAJOR HIGHWAY. <br />ENGINEER ENG THEN REVIEWED THE PROJECT COST STATUS FOR PHASES <br />I AND II OF THE GIFFORD WATER SYSTEM EXTENSION AND PRESENTED THE BOARD <br />WITH THE FOLLOWING.REPORT: <br />PROJECT COST STATUS <br />THROUGH DECEMBER 6, <br />1978, FOR <br />PHASES <br />I AND II - GIFFORD AREA AND <br />INDIAN RIVER COUNTY WATER SYSTEM <br />December 6, <br />1978 <br />I. <br />Cost Through Decembei 6, 1978 <br />Approximate <br />Budget <br />Items <br />Cost <br />Allocation <br />Remarks <br />1. <br />Phase I - Pump Station and <br />Elevated Tank <br />$538,302 <br />$ 670,000 <br />Ahead - $131,698 <br />2. <br />UDU Purchase <br />75,000 <br />75,000 <br />No Change <br />3. <br />Phase II - Construction <br />A. Renovate Existing Water System. <br />87,164(1) <br />34,800 <br />Behind ($52,364) <br />B. Sewage Pump & Transmission(2) <br />— <br />210,000 <br />Available <br />C. Renovation Existing Sewage System(2) -- <br />19,100 <br />Available <br />D. Water Distribution System(2) <br />Extension <br />-- <br />128,500 <br />Available <br />4. <br />Contingencies <br />-- <br />51,500 <br />Available <br />5. <br />Technical Services <br />50,826 <br />51,800 <br />Ahead - $974 <br />6. <br />Legal and Administrative <br />10,200 <br />10,200 <br />No Change <br />7. <br />Interest During Construction <br />19,100 <br />19,100 <br />No Change <br />Total <br />$780,592 76 <br />$1,270,000 <br />-- <br />BOK 'AGE 176 <br />DEC <br />