Laserfiche WebLink
I <br />s: <br />77 <br />DEC 1978 <br />Boa 38 PnE `77 <br />r$ <br />(1) Include Change Order'Nos. 1 and 2 and Leakage Survey. <br />(2) No Construction Started to Date. <br />(3) Includes South Gifford Area and Extra Meters. <br />II. Summary of Total Estimated Cost to Complete <br />A. Water System Extension(3) <br />1. Construction $307,554 <br />a. Extra Water Meters 60,000 <br />b. Contingency 27,000 <br />$394,554 <br />2. Engineering, Legal/Administrative, Interest <br />78,000 <br />Total <br />$472,554 <br />B. Sewage System Renovation <br />Total <br />250,600 <br />i <br />Total Estimated Cost to Complete <br />$723,154 <br />i <br />III. Project Summary <br />A. Funds Available <br />1. FmHA, EDA $1,270,000 <br />2. Additional FmHA 553,600 <br />f <br />Total <br />$1,823,600 <br />T <br />3 <br />B. Total Cost <br />1. To December 6, 1978 $ 780,592 <br />2. To Complete 723,1564' <br />Total <br />1,503,7 <br />Total Funds for Contingency <br />$ 319,80A' <br />, <br />NOTE: Funds Available from FmPA/EDA (Original) for <br />Water System Extension and Sewer System <br />Renovation to date: <br />1. Funds Available FmHA/IDA <br />$1,270,000- <br />1,270,0002, <br />2,Cost to December 6, 1978 <br />780,592 <br />;1 <br />Total Available To Date <br />$ 489,408 <br />I <br />s: <br />77 <br />DEC 1978 <br />Boa 38 PnE `77 <br />