My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/17/2009 (3)
CBCC
>
Meetings
>
2000's
>
2009
>
11/17/2009 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2020 12:02:34 PM
Creation date
10/1/2015 6:23:37 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Minutes
Meeting Date
11/17/2009
Meeting Body
Board of County Commissioners
Archived Roll/Disk#
4031
Book and Page
138, 393-430
Subject
Elections
Supplemental fields
SmeadsoftID
7589
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12. C. GENERAL SERVICES -NONE <br />I Z.D. HUMAN RESOURCES -NONE <br />12.E. HUMAN SERVICES -NONE <br />1 2. F. LEISURE SERVICES -NONE <br />12. G. OFFICE OF MANAGEMENT AND BUDGET -NONE <br />12.H. RECREATION -NONE <br />12.1. PUBLIC WORKS <br />12.11. STAFF UPDATE — SECTOR 3 BEACH RENOURISHMENT PROJECT <br />Coastal Resource Manager Jonathan Gorham reported that the Florida Department of <br />Environmental Protection (FDEP) had requested some revisions to the County's permit <br />modification for the upland sand, which included replacing the material from Ft. Pierce -based <br />Stewart Mining Industries, Inc. with material from Ranch Road Lake and Fischer & Sons. Dr. <br />Gorham advised that the modifications would be submitted to the State by Wednesday, <br />November 18, 2009. On that same date, staff would also be submitting to the FDEP and to the <br />U.S. Fish and Wildlife Service, a revised plan to build the Sector 3 Project in two phases, so an <br />evaluation can be made of the upland sand material with respect to sea turtle nesting (as directed <br />by the Board at the November 10, 2009 meeting). Concluding his update, Dr. Gorham <br />announced that on December 14, 2009, the FDEP would be holding a workshop and public <br />hearing for the establishment of the Erosion Control Line. <br />20 <br />November 17, 2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.