My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/24/1979
CBCC
>
Meetings
>
1970's
>
1979
>
1/24/1979
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:43:38 AM
Creation date
6/11/2015 10:57:24 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
01/24/1979
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />IN TYING IN. HE FURTHER NOTED THAT THE AREAS WE WILL GO TO WILL TAKE <br />IN SOME COMMERCIAL AREAS AND WILL ALSO INCLUDE GEOFFREY'S SUBDIVISION <br />WHICH HAS 113 POTENTIAL CUSTOMERS. HE STATED THAT HE WOULD, THEREFORE, <br />URGE THAT WE GO AHEAD WITH THE GRANT AND LOAN MONEY FROM FHA AND FELT WE <br />CAN PUT IN A SYSTEM WE CAN BE PROUD OF. <br />ENGINEER BEINDORF REVIEWED THE STEPS TO BE FOLLOWED IF THE <br />BOARD DESIRES TO AWARD THE BID TO CHAPMAN CONSTRUCTION CO. AND REPORTED <br />THAT THE CONTRACTOR IS PREPARED TO GO AHEAD AND SIGN THE FHA`PAPERS EVEN <br />THOUGH THE SIXTY DAY PERIOD FROM TIME OF THE BID IS UP IN FEBRUARY. <br />ENGINEER BEINDORF STATED THAT IF THIS PROCEDURE IS FOLLOWED, THE PRE - <br />CONSTRUCTION CONFERENCE MEETING COULD BE HELD AND NOTICE GIVEN TO PROCEED <br />IN THE FIRST WEEK IN MARCH. ENGINEER BEINDORF CONTINUED THAT IF WE <br />PROCEED WITH THE ADDITIONAL LOAN AND GRANT, THE MONEY IS THERE TO DO THE <br />CONSTRUCTION OF PHASE II BASED UPON THE 12" WATER LINES, AS WELL AS THE <br />LINES ALONG U.S. 1, BEING IRON INSTEAD OF PVC, AND THERE WOULD BE OVER <br />$300,000 REMAINING TO REPLACE LINES IN THE PINE VIEW PARK AREA OR TO BUY <br />EQUIPMENT, ETC. HE NOTED THAT THE PLANS ARE ALREADY DONE FOR THIS AREA. <br />CHAIRMAN WODTKE ASKED ABOUT THE TIME FRAME FOR THE SEWER. <br />ENGINEER BEINDORF STATED THAT ONCE THE BONDS ARE VALIDATED, <br />THEY ARE READY TO START PLANS IMMEDIATELY, BUT IT WILL TAKE 4 TO 5 MONTHS <br />BECAUSE THEY HAVE ONLY REVIEWED THE CONCEPT OF WHAT IS PROPOSED WITH <br />THE DEPARTMENT OF ENVIRONMENTAL REGULATION. <br />COMMISSIONER LYONS DISCUSSED COORDINATING THE TEARING UP OF <br />• STREETS FOR THE SEWER AND WATER. <br />CHAIRMAN WODTKE ASKED ABOUT THE OVERALL TIME FRAME. ENGINEER <br />BEINDORF FELT IT WOULD BE ABOUT 210 CALENDAR DAYS. <br />COMMISSIONER SIEBERT NOTED THAT IF WE BORROW THE MONEY AND GET <br />THE GRANT TO DO THE WHOLE PROJECT, WE BETTER BE PREPARED TO SPEND IT ALL <br />BECAUSE WE MUST USE THE BORROWED MONEY FIRST. THEREFORE, HE FELT WE <br />•` SHOULD EITHER PLAN TO DO.THE WHOLE PROJECT OR REDUCE THE AMOUNT OF THE <br />LOAN'. <br />CHAIRMAN WODTKE ASKED IF THE ENGINEERS COULD START THE SEWER <br />PLANS WITHOUT HAVING TO WAIT FOR THE BOND VALIDATIONS. <br />18-A <br />JAN 2 41979 <br />BOOK 38 PAGE 458 <br />
The URL can be used to link to this page
Your browser does not support the video tag.