My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/2/2003
CBCC
>
Meetings
>
2000's
>
2003
>
12/2/2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2017 11:40:21 AM
Creation date
10/1/2015 6:06:49 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC
Document Type
Minutes
Meeting Date
12/02/2003
Meeting Body
Board of County Commissioners
Archived Roll/Disk#
2574
Book and Page
126, 192-241
Supplemental fields
SmeadsoftID
519
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
them, and they no longer were considering the .22 acres. <br />Mr. Johnson specified that the neighbors wanted to maintain the CH zoning and do <br />not want to see the property rezoned CG because of all the ramifications. <br />Vice Chairman Ginn noted that CG will result in more trips per day. <br />Director Davis wished to readdressed the bridge and traffic issues and advised that <br />this proposed Walgreens will function similarly to the other 5 existing in the county. They <br />all have restricted driveways that limit certain left -turn movements on to arterial roads or <br />they limit ingress. There will be 3 pharmacies in this area. The trend is the people will go <br />to the easiest one accessible. He pointed out it would be safer to have two entries to this <br />location rather than just one restricted off Oslo Rd. <br />In response to Commissioner Lowther, Director Davis explained the traffic <br />signalization that will occur at the intersection during the construction of the roadway. He <br />advised that he is going back to our engineer to change the intersection to a full 5 -lane <br />section and next week he would be coming back with a recommendation for a project on <br />Oslo Road from 58tH Avenue to Timberidge where 5 -lanes currently exist. The light will <br />function within 8 months at the most. <br />Ruth Livingston, 655 46tH Avene SW, was concerned about drainage easements <br />and hoped somebody is looking for where that water will go when this is all built out. <br />Director Davis responded that his office is going to review the drainage plan for the <br />project and make sure there is not an impact to surrounding properties. The new <br />developments have to throttle back their stormwater discharge to meet the Indian River <br />Farms Water Control District 2" discharge requirement. <br />(CLERK=S NOTE: At approximately 11:50 a.m., Commissioner Adams returned to <br />the meeting.) <br />December 2, 2003 <br />25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.