My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2/21/1979
CBCC
>
Meetings
>
1970's
>
1979
>
2/21/1979
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:43:38 AM
Creation date
6/11/2015 11:00:24 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
02/21/1979
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
u <br />MR. FAIR NEXT READ FROM EXHIBIT #2, AN EXCERPT FROM SECTION 25 <br />OF THE INDIAN RIVER COUNTY CODE,'AS FOLLOWS: <br />"ESSENTIAL SERVICES - ESSENTIAL SERVICES.SHALL BE PERMITTED <br />IN ANY DISTRICT, AS AUTHORIZED AND REGULATED BY LAW AND RESOLUTIONS OF <br />INDIAN RIVER COUNTY, IT BEING THE INTENTION HEREOF TO EXEMPT SUCH <br />ESSENTIAL SERVICES FROM THE APPLICATION OF THIS ORDINANCE EXCEPT THAT <br />ALL BUILDINGS OR STRUCTURES TO BE LOCATED IN RESIDENTIAL DISTRICTS SHALL <br />BE SUBJECT TO SITE PLAN APPROVAL." <br />MR. FAIR CONTINUED THAT DEVELOPMENT IS NOT INTERFERED WITH <br />AND IS NOT INCONSISTENT WITH THE ACHIEVEMENTS OF THE OBJECTIVES OF THE <br />STATE DEVELOPMENT PLAN, AND THIS IS NOT LOCATED IN AN AREA WHERE CRITICAL <br />SAFETY IS CONCERNED. HE THEN DISCUSSED FACTORS WHICH LED TO THE SELECTION <br />OF THE PROPOSED ROUTE AND DISPLAYED A MAP, GIVING AN OVERVIEW OF THE <br />ENTIRE PROJECT." PIR. FAIR REPORTED THAT THEY INTEND TO UTILIZE A PORTION <br />OF A RIGHT-OF-WAY IN ST. LUCIE COUNTY;AND THE ST. .JOHNS MARSH AREA IS <br />CONSIDERED TO BE THE MOST SIGNIFICANT FROM AN ENVIRONMENT AND CONSTRUCTION <br />STANDPOINT AND WHICH WOULD PRESENT PROBLEMS WERE THEY TO TRY TO DIVERSE <br />IN AN EAST -WEST DIRECTION. -HE CONTINUED THAT THE MAP SHOWED LANDS OWNED <br />BY THE ST, JOHNS RIVER WATER MANAGEMENT DISTRICT AND FLOOD AREAS SUBJECT <br />TO THEIR MANAGEMENT, MR. FAIR +COMMENTED THAT THE OVERLAY SHOWED BULL <br />CREEK WILDLIFE MANAGEMENT AREA IN OSCEOLA COUNTY AND THERE WERE SEVERAL <br />AREAS THAT WERE CRITICAL AS THEY WERE THE HABITAT OF THE FLORIDA EVER- <br />• <br />GLADES PIKE AND THE DUSKY SEASIDE SPARROW. HE THEN ADVISED THERE WAS <br />ONE -SUCH AREA IN INDIAN RIVER COUNTY AND EFFORTS WERE DIRECTED TO TRY TO <br />GO WEST OF THE ST. .JOHNS MARSH IN ORDER TO AVOID THE SEVERE ENVIRONMENTAL <br />CONSTRAINTS WITHIN THE MARSH, MINIMIZING THE LENGTH OF THE LINE AT THE <br />SAME TIME. <br />MR. FAIR STATED THE COST FOR THIS PROJECT IS $600,000 TO <br />$700,000 A MILE FOR A SINGLE LINE AND WHERE THEY HAVE TWO LINES TOGETHER, <br />THE LENGTH IS EVEN MORE CRITICAL AND THEN THE COST IS DOUBLED TO <br />$1,200,000 TO $1,400,000 A MILE. -HE FURTHER REPORTED THAT THEY ARE USING <br />SOUND ENGINEERING PRINCIPLES AND ARE MINIMIZING THE LENGTH DUE TO COST. <br />MR. FAIR THEN SAID THE DRI PROCESS IS NOT A PROCESS THAT DEALS WITH <br />26 <br />FEB 2 11979 <br />BOOK 39 PAGE 10 7 . <br />
The URL can be used to link to this page
Your browser does not support the video tag.