Laserfiche WebLink
• <br />A <br />-a Kunde• Driver -Simpson G Associates. Inc. <br />Page 2 <br />= 1.5 SUBCONTRACTING OF*WOHK <br />It is our intent at this time to perform all work required <br />by this proposal. We will seek the approval of the County <br />for any work that would require subcontracts. <br />1.6 COMMENCEMENT OF WORK <br />The work shall commence within 5 days after execution of <br />agreement and upon written notice to proceed, and shall be <br />completed in accordance with the schedule shown under Item <br />4.0, <br />1.7 PAYMENT SCHEDULE r <br />Fees for all work outlined in this proposal shall be in <br />accordance with that set forth in Item 5.0. Progress pay- <br />ments shall be made monthly based upon the percentage of <br />work completed subject to a retainage of 10% up to the time <br />the work is complete. The retention shall be held by the <br />County until all work has been completed. <br />2.0 SCOPE OF WORK <br />2.1 DESIGN PHASE <br />After written authorization from COUNTY to proceed with the <br />Design Phase, ENGINEER shall perform the following services: <br />2.1.1 Provide COUNTY with all documents and design data <br />that ENGINEER can provide to the best of its ability <br />which is required in order to obtain the approval <br />acid/or permission of any and all governmental autho- <br />rities having jurisdictii6n over design criteria <br />applicable -to the PROJECT. ENGINEER shall further <br />assist in obtaining such approvals by submitting all <br />required data and documents to and participating in <br />the negotiations with any and all of said governmen- <br />tal authorities. Should any design -changes to ,the <br />existing plant be required to be made by ENGINEER in <br />order to obtain the approval of said governmental <br />authorities, said changes shall be considered as <br />Additional Services. <br />2.1.2 Provide COUNTY with a detailed written opinion of <br />the probable PROJECT cost estimate. <br />2.1.3 Prepare and provide contract documents, forms and <br />specifications to be utilized by COUNTY in putting <br />to bid the construction work to be performed on the <br />PROJECT. <br />MAR 71979 <br />39K G E I In <br />