Laserfiche WebLink
• <br />Kunde•Driver•Simpson&Associates,Inc. Page 3 <br />2.1.4 After written authorization from COUNTY to proceed <br />with the Bidding, ENGINEER shall assist COUNTY in <br />.obtaining bids -for the construction work to be per- <br />formed on the PROJECT, consult with and advise <br />.COUNTY in the evaluation of such bids and in the <br />assembling and awarding of contracts for the.con- <br />struction work to be done on the PROJECT. <br />2.3 CONSTRUCTION PHASE <br />After written authorization from COUNTY to proceed with •the <br />Construction Phase, ENGINEER shall perform the following <br />services: <br />2.3.1 Review and approve shop drawings. <br />2.3.2 Review and approve the results of all tests. <br />2.3.3 Issue all instructions of COUNTY to Contractor and <br />prepare and recommend in writing to COUNTY the ap- <br />proval of any and all change orders. <br />2.3..4 Conduct an inspection to determine if the PROJECT <br />has been completed and if Contractor has fulfilled <br />al,l of his obligations. Make written approval and <br />recommendations to COUNTY that final payment be <br />either made or not made to Contractor. <br />2.3.5 Furnish to COUNTY an as -built set of prints to be <br />prepared by Contractor. <br />2.3.6 Provide a Resident PROJECT Representative who will <br />provide inspection of the construction of the PROJECT. <br />Said Resident PROJECT Representative shall be an agent <br />of ENGINEER and shall act by and under the supervision <br />of ENGINEER. The PROJECT Representative shall perform <br />as a minimum the following services: <br />2.3.6.1 Schedule%: Review Contractor's progress <br />schedule and Shop Drawings.. Attend pre - <br />construction conferences and meetings and <br />serve as ENGINEER'S liaison with Contractor. <br />a. Conduct on-site observations of the work <br />in progress by Contractor to determine <br />that the PROJECT is proceeding in accord- <br />ance with the Contract Agreement between <br />Contractor and COUNTY, and that completed <br />work will conform to said Contract agree- <br />ment, and report to COUNTY whenever he <br />believes that any work is unsatisfactory, <br />or does not conform to Contractor's <br />Contract Agreement. <br />0 <br />WK 39 PAGE 16e3 <br />