My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/7/1979
CBCC
>
Meetings
>
1970's
>
1979
>
3/7/1979
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:43:38 AM
Creation date
6/11/2015 11:02:02 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
03/07/1979
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kunde•Dfivef•Simpson b Associates. Inc. Page 4 <br />b. Keep a diary or log book which records <br />hours on the job site, weather condi- <br />tions, data relative to questions of <br />extras or deductions, daily activities, <br />the daily progress of construction, and <br />test procedures. <br />C. Furnish COUNTY periodic reports of pro- <br />gress of the work and of Contractor's• <br />compliance with the approved progress <br />schedule, schedule of Shop Drawing <br />submissions and other schedules. <br />3.0 FEE DATA f^ <br />We enclose for your analysis and review a breakdown of pro- <br />posed fees. The fee is shown in two phases. The first is <br />the design phase including the required out-of-pocket: <br />expenses and the second is the construction phase. <br />4.0 PERFORMANCE; SCHEDULE <br />It is proposed t.o complete the design phase in 3 months, <br />assuming no major problems with the permit requirements. <br />The construction phase will continue throughout the duration <br />of the construction contract. At this time it is estimated <br />the construction contract time will be 304 calendar days. <br />5.0 FEE <br />For the services to be performed under this proposal a lump <br />sum fee of Seven Thousand One Hundred Sixteen Dollars <br />and 00/100 ($7,116.00) fnr the design phase and Thirty Two <br />Thousand Five Hundred and 00/100 ($32,500.00) for the <br />construction phase. <br />We appreciate the opportunity to submit this proposal, <br />and are prepared to discuss any questions that may arise. r <br />If you require any additional information, please contact us. }. <br />Very truly yours, <br />KUNDE, DRIVER, MPSON & ASSOCIATES, INC. f <br />I; <br />B. C. Simpson, P.E. <br />Vice President <br />BCS/ja <br />Enclosures <br />BAR 71919 <br />
The URL can be used to link to this page
Your browser does not support the video tag.