My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/7/1979
CBCC
>
Meetings
>
1970's
>
1979
>
3/7/1979
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:43:38 AM
Creation date
6/11/2015 11:02:02 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
03/07/1979
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAR 71979 <br />BOOK 39 PACE 165 <br />Kunde• Driver -Simpson b Associates. Inc. <br />Paqe 5 <br />FETE: BREAKDOWN <br />Design Ph�ese: <br />Item <br />Manhours. <br />1. Review of plans G project site <br />32 <br />2. Preparation of Contract Documents <br />80 <br />3. Permit sketches and data <br />60 <br />4. Permit coordination and meetings <br />32 <br />5. Final cost estimate <br />12 <br />6. Advertising for bids <br />8 <br />7. Miscellaneous Conferences G Meetings <br />16 <br />240 <br />240 Manhours @ $9.00/Hr. x 2.6 = <br />$ 5,616 <br />Out -of -Pocket Expenses: <br />Printing: $1,400 <br />Materials: 100 <br />$1,500 <br />1,500 <br />Total Design Phase <br />• <br />$ 7,116 <br />Construction Phase: <br />Inspection, meetings, etc. <br />1,000 manhours @ $13.64%/Hr. x 2.2 = <br />$30,000 <br />Utit-of-Pocket Expenses: <br />Automobile @ $250/mth. x 10 = <br />2,500 <br />Total Construction Phase <br />$32,500 <br />Total Fee <br />$39,616 <br />Say <br />$39,600 <br />Note: <br />Testing will be performed by a qualified testing <br />laboratory and <br />paid for by the County. The estimated <br />cost for <br />testing is <br />approximately $2,500. <br />MAR 71979 <br />BOOK 39 PACE 165 <br />
The URL can be used to link to this page
Your browser does not support the video tag.