My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/9/1979
CBCC
>
Meetings
>
1970's
>
1979
>
5/9/1979
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:43:38 AM
Creation date
6/11/2015 11:01:16 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
05/09/1979
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s <br />WITH THE WORK REQUESTED BY THE GIFFORD PROGRESSIVE CIVIC LEAGUE IF, <br />IN HIS OPINION, THE WORK CAN BE DONE EXPEDITIOUSLY WITHOUT GREAT INCON- <br />VENIENCE TO THE ROAD AND BRIDGE DEPARTMENT, <br />CONSULTING ENGINEER .JAMES BEINDORF CAME BEFORE THE BOARD TO <br />REPORT ON THE STATUS OF THE 6TH AVENUE SEWER ALLOCATIONS, HE -STATED <br />THAT THE ASSISTANT ADMINISTRATOR SENT OUT FLYERS TO THE MULTI -FAMILY AND - <br />COMMERCIAL ESTABLISHMENTS IN THIS AREA TO SEE IF THEY WANTED TO TIE INTO <br />THE COUNTY SYSTEM FOR SEWAGE, MR. BEINDORF STATED THAT THE RESPONSE <br />ACTUALLY WAS QUITE POOR AND THEIR PREVIOUS REPORT ANTICIPATED MORE THAN <br />ARE SHOWN PRESENTLY; SO THERE IS.NOW A RESERVE OF 790 CONNECTIONS. HE <br />INFORMED THE BOARD THAT THE TOTAL DEMAND FROM ALL THE PEOPLE WHO HAD <br />WRITTEN IN TO THE COUNTY REQUESTING TIE-INS OVER THE PAST FIVE OR SIX <br />MONTHS AMOUNTS TO 1,037 UNITS, WHICH WOULD MAKE US ROUGHLY 200 UNITS <br />SHY. HE ASKED'THE BOARD WHAT KIND OF PROCEDURES THEY WISHED TO ESTABLISH <br />TO ALLOW PEOPLE TO TIE INTO THE 6" FORCE MAIN AND ALSO BROUGHT UP THE <br />MATTER OF SEWAGE RATES, HE COMMENTED THAT THEY WOULD LIKE TO WORK ON A <br />BASIS OF NO MORE THAN 10 UNITS PER ACRE, <br />COMMISSIONER SIEBERT NOTED THAT WE•INTENDED TO RESERVE ALLOCA- <br />TION FOR THE ESTABLISHMENTS LISTED ON THE FIRST PAGE OF THE ENGINEER S <br />REPORT AND BELIEVED IT WAS FELT WE SHOULD MAKE THE BALANCE AVAILABLE ON <br />A FIRST COME, FIRST SERVED BASIS FOR WHOEVER GETS THEIR SITE PLANS <br />APPROVED FIRST, <br />DISCUSSION FOLLOWED ON REQUIREMENTS FOR ALLOCATIONS AND THE <br />ADVISABILITY OF REQUIRING CONSTRUCTION DRAWINGS IN ADDITION TO SITE PLAN <br />APPROVAL AND SETTING A SPECIFIC TIME PERIOD BECAUSE'WE DO NOT WANT THE <br />ALLOCATIONS USED FOR SPECULATION, ATTORNEY COLLINS NOTED THAT THE <br />APPLICANT SHOULD SHOW THEY HAVE A SOURCE OF WATER. <br />COMMISSIONER LYONS SUGGESTED THE APPLICANT COULD APPLY FOR <br />THEIR ALLOCATION CONCURRENT WITH THEIR APPLICATION FOR A BUILDING <br />PERMIT, AND THE ALLOCATION WOULD BE IN EFFECT FOR A CERTAIN PERIOD OF <br />TIME. <br />ENGINEER BEINDORF FELT THE DER WILL ISSUE PERMITS CONTINGENT <br />ON THE LINE BEING THERE TO USE, AND THAT THEY WILL WORK WITH US BECAUSE <br />THEY KNOW WHAT WE ARE TRYING TO DO. <br />.MAY 91979 <br />mol <br />BOQK'® PAGE <br />
The URL can be used to link to this page
Your browser does not support the video tag.