Laserfiche WebLink
<br />The SWDD Board approved the following recommendations and <br />authorized staff to proceed with their implementation: <br /> <br /> Northern Expansion Area <br />Revised the conceptual FDEP Environmental Resource <br />Permit (ERP) to leave the IRFWCD C-5 canal in place <br />thereby keeping options open for possible future <br />development (landfill or otherwise). <br /> <br />The existing landfill and the northern expansion area will <br />not be hydraulically connected. <br /> <br />SWDD’s yard waste processing area will remain at its <br />present location. <br /> <br />SWDD has a consumptive use permit for dewatering of <br />the excavation area of a stormwater pond in the northern <br />expansion area. The excavated materials could be used as <br />a source of fill for the current site expansion described <br />below. <br /> <br />Demolish the former truss plant facility located in the <br />northern expansion area to prevent additional hurricane <br />February 21, 2006 <br />4 <br />S.W.D.D. <br /> <br /> <br /> <br /> <br />