My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/20/1979
CBCC
>
Meetings
>
1970's
>
1979
>
6/20/1979
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:43:39 AM
Creation date
6/11/2015 11:04:19 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
06/20/1979
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JACK G JF NNINGS. Administrator <br />f <br />April 24, 1979 <br />P <br />BOARD OF COUNTY COMMISSIONERS <br />WILLIAM C. WODTKE. JR.. Chairman <br />ALMA LEE LOY, Vice Chairman <br />WILLARD W. SIEBERT, JR. <br />EDWIN S. SCNMUCKER <br />R. DON DEESON <br />2145 14th Avenue Vero Beach, Florida 32060 <br />Sverdrup & Parcel and Associates, Inc. <br />and Beindorf and Associates, Inc., <br />A Joint Venture <br />Post Office Box 849 <br />Vero Beach, Florida 32960 <br />Attention: Mr: James L. Beindorf <br />Re: Pebble Bay Sewage Plant <br />Renovations <br />Dear Mr. Beindorf: ' <br />This letter will serve as your authorization to proceed on the various items of <br />work as discussed with.you yesterday with your Mr. John Robbins, Neil Nelson, and <br />the writer. We understand that your projected engineering fees would not exceed <br />$1,200.00 and, if in any case they were to exceed this amount, that you would not <br />do any further work without written authorization from this office. We understand <br />that you will do the following: <br />1. Coordinate required analysis of raw wastewater and coordinate analytical <br />work required for process control, e.g., MLVSS and dissolved oxygen deter- <br />minations. Actual analytical work to be paid for by County. <br />2. Coordinate elevation determinations of all tankage and pertinent transfer <br />pipes. County personnel will perform actual survey work. <br />3. Based on raw wastewater analysis, you will prepare a process design which <br />will outline operational control parameter ranges. <br />4. Provide consultation services to County operating personnel for process <br />control and analysis of all analytical data. <br />5. Perform inspection of physical modifications to treatment plant and provide <br />consultation services for required modifications. <br />6. Serve as project management for improvements to treatment unit and coordinate <br />. all activities through the County Administrator's office. <br />By this letter, you are instructed Lo proceed as soon as possible in order that we <br />may bring this plant into full service. <br />Very .truly yours, <br />Jack C. Jennings <br />County Administrator <br />JUS 2 0 1979 Boa 41 PACE 37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.