My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/20/1979
CBCC
>
Meetings
>
1970's
>
1979
>
6/20/1979
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:43:39 AM
Creation date
6/11/2015 11:04:19 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
06/20/1979
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MR. ROBBINS STATED THAT THERE ARE MANY DEFICIENCIES IN THE <br />PLANT, AND IT NEEDS TO BE PUT IN OPERATING ORDER SO AS NOT TO RECEIVE <br />A CITATION FROM THE DER. HE ESTIMATED THAT IT WOULD TAKE $4,000 TO <br />$5,000 WORTH OF WORK TO PUT THE PLANT BACK INTO OPERATION. <br />ON MOTION BY COMMISSIONER SIEBERT, SECONDED BY COMMISSIONER <br />LYONS, THE BOARD UNANIMOUSLY APPROVED THE EMERGENCY ACTION TAKEN BY <br />THE COUNTY ADMINISTRATOR AUTHORIZING THE ADDITIONAL ENGINEERING SERVICES <br />FOR THE PEBBLE BAY PLANT. <br />CHAIRMAN WODTKE NEXT DISCUSSED THE PROPOSALS MADE BY DEAN LUETHJE <br />AND MR, WILSON REGARDING THE PROPOSED PROJECT AT HIBISCUS AIRPORT THIS <br />MORNING, WHICH INCLUDED THE POSSIBILITY OF PUTTING IN A TEST WELL TO <br />DETERMINE THE QUANTITY AND QUALITY OF WATER AT THAT SITE. THE CHAIRMAN <br />CONTINUED THAT THE BOARD WOULD LIKE TO HAVE THE CONSULTANTS LOOK INTO <br />THIS, DETERMINE WHAT THE COST OF THE TRANSMISSION LINE WOULD BE, IF IT <br />WERE ACCEPTABLE, AND WHETHER THE MID -FLORIDA UTILITIES PLANT WOULD TAKE <br />THE 700,000 GPD. <br />COMMISSIONER SIEBERT STATED THAT HE AND COMMISSIONER DEESON <br />WOULD GET TOGETHER WITH THE CONSULTANTS TO DISCUSS THIS MATTER. <br />MR.-BEINDORF NEXT DISCUSSED SETTING A DATE AT THE NEXT MEETING <br />FOR A WORKSHOP CONCERNING THE DRAINAGE STUDY FOR THE SOUTH COUNTY IN- <br />VOLVING THE AREA SOUTH OF ROCKRIDG'E. <br />DISCUSSION WAS HELD CONCERNING SITE PLAN BEING AMENDED IN THE <br />6TH AVENUE AREA, <br />MR. BEINDORF STATED THAT ANY IMPROVEMENTS MADE WILL HAVE TO <br />BE APPROVED BY THREE AGENCIES, AND SOME OF THEM COULD BE AFFECTED BY <br />THE SITE PLAN BEING AMENDED. <br />ANN ROBINSON ASKED IF THE BOARD WOULD GIVE THE PLANNING & <br />ZONING COMMISSION SOME DIRECTION. <br />ADMINISTRATOR .JENNINGS STATED THAT WE ARE NOW WAITING FOR <br />REPORTS FROM EACH OF THE GOVERNMENT AGENCIES REPRESENTED AT THE MEETING <br />WE HAD REGARDING DRAINAGE IN THE ROCKRIDGE AREA, AND WHEN WE GET THE <br />INPUT REQUESTED FROM THEM, IT WILL BE EVALUATED AS QUICKLY AS POSSIBLE <br />SO THE BOARD CAN THEN MAKE SOME DECISION. ADMINISTRATOR JENNINGS NOTED <br />THAT WE MUST GET PERMITS FROM THE AGENCIES PLUS GET IN TOUCH WITH <br />LANDOWNERS. <br />38 <br />om <br />BOOK 41 PAGE 38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.