Laserfiche WebLink
� � r <br />THEREFORE, ARE GOING TO HAVE TO INTERVIEW OTHER ENGINEERING FIRMS <br />AND SELECT ONE TO DO THE DESIGN MODIFICATION. <br />MOTION WAS MADE BY COMMISSIONER LYONS, SECONDED BY COM- <br />MISSIONER LOY, TO AUTHORIZE THE ADMINISTRATOR TO GO OUT FOR BID FOR <br />CONSULTING ENGINEERS TO DO THE DESIGN MODIFICATION NECESSARY FOR <br />INDIAN RIVER BOULEVARD. <br />COMMISSIONER LOY ASKED WHAT ASSURANCE WE CAN GET THAT <br />WHEN WE REVISE THESE PLANS FOR THE 3RD OR 4TH TIME THAT THEY WILL <br />BE APPROVED, AND COMMISSIONER LYONS DID NOT FEEL WE CAN CET ANYTHING <br />CONCRETE, HE STRESSED THAT TIME IS OF THE ESSENCE TO TRY AND GET <br />THIS COMPLETED WHILE THE SAME DER PEOPLE ARE STILL INVOLVED. <br />COMMISSIONER LOY EXPRESSED SURPRISE THAT THE FIRM WHO DID <br />THIS WORK ORIGINALLY WOULD CHARGE THAT MUCH FOR THE MODIFICATIONS. <br />ASSISTANT ADMINISTRATOR NELSON EXPLAINED THAT THE ROAD <br />HAS BEEN CHANGED FROM FOUR LANE TO TWO LANE AND ALSO HAS CONE FROM <br />BOX CULVERTS TO TWO BRIDGES. <br />THE CHAIRMAN CALLED FOR THE QUESTION. -IT WAS VOTED ON AND <br />CARRIED UNANIMOUSLY. <br />ON MOTION BY COMMISSIONER LOY, SECONDED BY COMMISSIONER <br />SIEBERT, THE BOARD UNANIMOUSLY ACCEPTED THE PROPOSAL FROM MID SOUTH <br />ENGINEERING COMPANY IN REGARD TO REVISING PERMIT APPLICATIONS FOR <br />THE CONSTRUCTION OF INDIAN RIVER BLVD. AND AUTHORIZED THE SIGNATURE <br />OF THE CHAIRMAN. <br />69 <br />OCT 10 1979 Boa 41 PAGE 9! <br />