My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/7/1979
CBCC
>
Meetings
>
1970's
>
1979
>
11/7/1979
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:43:40 AM
Creation date
6/11/2015 11:11:21 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
11/07/1979
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0110 71979 P, 2 FacE ®Z <br />LLOYD AND AssactATEs <br />ENGINEERS AND SURVEYORS <br />REPORTS <br />DESIGNS <br />SUPERVISION <br />APPRAISALS <br />CONSULTATIONS <br />November 69 1979 <br />Board of County Commissioners <br />Indian River County Courthouse <br />Vero Beach, Florida 32960 <br />RE: Castaway Cove, Wave Two <br />A Subdivision <br />Section 8-33-40 <br />Gentlemen: <br />ROBERT F. LLOYD <br />REGISTERED CIVIL ENGINEER 3538 <br />REGISTERED LAND SURVEYOR 944 <br />(305) 562-4112 <br />1835 20TH STREET <br />VERO BEACH, FLORIDA <br />329613 <br />In regard to the improvements on the unrecorded plat of Castaway Cove, <br />Wave Two, the undersigned hereby certifies as to the work completed <br />and the amounts required to complete the improvements on the lands <br />being subdivided, <br />1. Executed construction contract: <br />Bain Underground Utilities, Inc., General Contractor <br />Dickerson, Inc., Street Sub -contractor <br />a. Contract provides sewerage within the sub- <br />division and transmission to the Vero Beach <br />Sewage Treatment Plant via an existing force <br />main. This work is substantially complete. <br />b. Contract provides water distribution within <br />the subdivision. Water is supplied by the City <br />of Vero Beach, and all acreage charges and <br />special tapping fees due under the Moorings <br />Agreement have been paid. This work is <br />substantially complete. <br />V. <br />In regard to the improvements on the unrecorded plat of Castaway Cove, <br />Wave Two, the undersigned hereby certifies as to the work completed <br />and the amounts required to complete the improvements on the lands <br />being subdivided, <br />1. Executed construction contract: <br />Bain Underground Utilities, Inc., General Contractor <br />Dickerson, Inc., Street Sub -contractor <br />a. Contract provides sewerage within the sub- <br />division and transmission to the Vero Beach <br />Sewage Treatment Plant via an existing force <br />main. This work is substantially complete. <br />b. Contract provides water distribution within <br />the subdivision. Water is supplied by the City <br />of Vero Beach, and all acreage charges and <br />special tapping fees due under the Moorings <br />Agreement have been paid. This work is <br />substantially complete. <br />
The URL can be used to link to this page
Your browser does not support the video tag.