My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/7/1979
CBCC
>
Meetings
>
1970's
>
1979
>
11/7/1979
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:43:40 AM
Creation date
6/11/2015 11:11:21 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
11/07/1979
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
November 6, 1979 <br />Board of County Commissioners <br />RE: Castaway Cove, WaveTwo <br />PAGE TWO <br />c. Private streets are being constructed under <br />the contract. Rough grade and subgrade <br />stabilization is complete. Limerock base <br />has been laid, however rough grade, and <br />fine grade work have not been completed as of <br />November 5, 1979. Limerock work is <br />estimated to'be 75%a completed. The wearing <br />surface of 1" Type H Asphalt will be post- <br />poned until Swale grading is completed. <br />d. Facilities for storm water disposal being of <br />the new environmental type designed to perco- <br />late the first inch of rainfall into the ground is <br />now under way. All storm water pipe and <br />appurtenances are off the traveled way. Seven <br />catchbasins with percolation trenches have <br />been completed out of the twenty-four (24) <br />required, and approximately $8, 101. 25 in <br />manholes and filter rock belonging to the Owner <br />are stored on the site. The work plus the pre- <br />cast manholes and filter rock stored on the site <br />is estimated to be 44% completed. <br />2. The money required to complete the sewer, water, streets <br />and storm drainage in Castaway Cove, Wave Two is as <br />follows: <br />Construction as of November 6, 1979 <br />Sewers Complete <br />Water Complete <br />Storm Drain -Completion Cost $27,932.04 <br />Streets -Completion Cost $36,033.29 <br />10% Retainage due Contractor $22,270.94 <br />Engineering, Inspection & <br />Surveying $20,000.00 <br />Total money required to <br />Complete: $106,236.27 <br />OV 71979 3 LOOK 42 FAGS 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.