My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/5/1979
CBCC
>
Meetings
>
1970's
>
1979
>
12/5/1979
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:43:40 AM
Creation date
6/11/2015 11:14:54 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
12/05/1979
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />DEC 51979 <br />Bou 4,9 FAcE21Z <br />B. REVISED PHASE I WATER SYSTEM IMPROVEMENTS <br />1. Water Treatment Plant and Well Field <br />The proposed Phase I water treatment plant and well <br />field improvements are as proposed in the April, 1979 report. The <br />improvements consist of constructing a 2.5 million gallons per day <br />(mgd) reverse osmosis treatment plant and well field. The reserve <br />capacity of this treatment plant is estimated to be approximately <br />2,115 equivalent residential -water connections. The well field <br />will consist of three (3) wells tapping the Floridan (deep) aquifer <br />and a manifold piping system. <br />2. Transmission -Distribution System <br />The proposed Phase I -water transmission -distribution <br />system has been revised to reduce initial construction costs. The <br />revisions include deleting water lines that previously proposed <br />to provide fire protection only, deleting fire hydrants along these <br />water lines and other areas presently served, and utilizing poly- <br />vinyl chloride (PVC) pipe for water lines 12 -inches in diameter <br />and smaller. The revisions to the proposed Phase I transmission - <br />distribution system layout are shown on Figure 1. <br />3. Estimated Construction Cost <br />The estimated construction costs of the revised Phase I <br />improvements are shown in Table I. As shown in this table, the <br />estimated construction costs of the revised transmission -dis- <br />tribution system and the treatment plant are $1,307,000 and <br />$3,457,000, respectively. The total construction cost of the revised <br />Phase I improvements is estimated to be $4,764,000. These <br />estimates are based on mid -1979 prices. <br />_I <br />
The URL can be used to link to this page
Your browser does not support the video tag.