Laserfiche WebLink
41 <br />TABLE I <br />SOUTH MUNICIPAL TAX DISTRICT WATER SYSTEM IMPROVEMENTS <br />REVISED PHASE I -ESTIMATED CONSTRUCTION COST <br />I, Transmission -Distribution Svstem: <br />2 -inch PVC Pipe (3,920 LF) <br />$ 15,680 <br />6 -inch PVC Pipe (11,220 LF) <br />72,930 <br />8 -inch PVC Pipe (900 LF) <br />7,650 <br />10 -inch PVC Pipe (11,610 LF) <br />121,910 <br />12 -inch PVC Pipe (3,170 LF.) <br />44,380 <br />14 -inch D.I.P. (5,810 LF). <br />139,440 <br />20 -inch D.I.P. (6,000 LF) <br />210,000 <br />30 -inch D.I.P. (530 LF) <br />34,450 <br />.Fire Hydrant Assembly (41 Ea.) <br />45,100 <br />Valves and Boxes <br />25,000 <br />Cast Iron Fittings <br />22,000 <br />Pavement Replacement <br />14,000 <br />Cased Crossings (360 LF) <br />54,000 <br />New Service Connections (478 Ea.) <br />95,600 <br />Connections to Existing Lines (23 Ea.) <br />11,500 <br />Refurbish existing Mid -Fla. 150,000 gal. <br />elevated tank <br />20,000 <br />500,000 gal. elevated storage tank (I Ea.) <br />341,000 <br />2,700 gpm high service pump (3 Ea.) <br />32,000 <br />Subtotal: <br />$1,307,000 <br />11. Treatment Plant and Well Field <br />Deep Aquifer Test Well Program <br />$ 63,000 <br />Deep Aquifer Well Field 8 Manifold <br />326,000 <br />2.5 MGD Reverse Osmosis Treatment Plant <br />2,788,000 <br />2.0 MG Ground Storage Tank <br />280,000 <br />Subtotal: $3,457,000 <br />TOTAL: $4,764,000 <br />DEC 51979 600K 42 PAGE 2.1:3 <br />