My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/18/2004
CBCC
>
Meetings
>
2000's
>
2004
>
05/18/2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2022 4:30:08 PM
Creation date
10/1/2015 6:03:57 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Minutes
Meeting Date
05/18/2004
Meeting Body
Board of County Commissioners
Archived Roll/Disk#
2928
Book and Page
127, 017-057
Supplemental fields
SmeadsoftID
424
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
thrd <br />construct a place of worship located on the north side of 9 Street SW (Oslo Road), east of 33 <br />Court SW. He made two corrections to the backup: 1) page 76, paragraph 1, should read RS-3, <br />instead of RS-6, and 2) page 79, paragraph Item 14.b, Tree Protection: should read “12 trees that <br />are 20 inches or larger are being preserved”, instead of “Eleven of the preserved trees are at least <br />33 inches in diameter. There are no trees on the site 33 inches in diameter. He reviewed Phase I <br />and Phase II of the project displaying aerial views of the site. He said staff is recommending <br />approval and Planning and Zoning voted 6-0 for the Board to approve the special exception use <br />request. <br />In response to Commissioner Lowther’s concerns regarding traffic impact Director <br />Boling said it was not a requirement to have a deceleration lane. Director Davis explained they do <br />rd <br />have plans to extend the widening of Oslo Road west to 43 Avenue in a few years. It does not <br />include a separate turn lane beyond the 5 lanes. Usually church traffic is in the off peak hours and <br />unless they have a school, a right turn lane is not warranted for a church. <br /> <br />The Chairman opened the public hearing and asked if anyone wished to be heard <br />regarding this matter. <br /> <br />nd <br />Mr. Fandrey <br />, 687 32 Court SW, did not object to the construction of the church, <br />but wanted to know how far back the building will be from the property line, because their <br />property borders the property of the church. <br />Director Stan Boling said the proposed pavilion is the northernmost proposed <br />building and it appears to be 200 feet from the north property line. The main facility is probably <br />500 feet or more from the property line. <br /> <br />The Chairman asked if anyone else wished to be heard with regard to this matter. <br />There being none, the Chairman closed the public hearing. <br /> <br />May 18, 2004 <br />10 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.