My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/19/1979
CBCC
>
Meetings
>
1970's
>
1979
>
12/19/1979
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:43:40 AM
Creation date
6/11/2015 11:17:13 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
12/19/1979
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEC 1 ,9 1979 <br />Geraghty & Miller, Inc. <br />BOOK <br />42 PAGE 374 <br />Forum III <br />Suite 403 <br />1675 Palm Beach Lakes Boulevard <br />West Palm Beach, Florida 33401 <br />CONSULTING GROUND -WATER GEOLOGISTS AND HYDROLOGISTS Telephone: 305/683-3033 <br />12 December 1979 <br />Indian River County Commissioners <br />Indian River County Courthouse <br />2145 14th Avenue <br />Vero Beach, Florida 32960 <br />Dear Commissioners: <br />We are aware that Indian River County has decided to proceed <br />with the planning, design, and construction of a water system <br />for the South County Taxing District, using reverse osmosis <br />to treat water from the Floridan Aquifer. To assist the County <br />in accomplishing its goal, Geraghty & Miller, Inc., proposes <br />to conduct a testing program in the taxing district area. To <br />date, preliminary evaluation of the availability and quality <br />of water contained in the Floridan Aquifer within the taxing <br />district has been made by extrapolating data from outside the <br />district. More specific information is now needed. In addi- <br />tion, a testing program will be necessary to determine the <br />regional impact of the proposed diversion, provide information <br />for system planning and plant design, and provide technical <br />data which will be needed to obtain a water -use permit from <br />the St. Johns River Water Management District. <br />Five tasks are planned for the testing program: The principal <br />task is the drilling, sampling and testing of a 16 -inch -diameter <br />test -production well and a 12 -inch -diameter observation -produc- <br />tion well. Additional tasks are the preparation of technical <br />specifications for the testing program; inventorying of existing <br />wells (well permittees and existing legal users who might be <br />affected by the proposed diversion); preparing and presenting <br />of progress reports and the final report; and meeting with the <br />Joint Venture, regulatory agencies, and county personnel. <br />WASHINGTON; NY TAMPA. FL <br />�M BEACH..FL <br />i <br />CHAMPAIGN. IL . CT _� _ <br />
The URL can be used to link to this page
Your browser does not support the video tag.