Laserfiche WebLink
Geraghty & Miller, Inc. <br />, _ M _. <br />I. R. County Comm. - 4 - 12 Dec 79 <br />will be conducted in the region above the Floridan Aquifer to <br />detect the presence or absence of this aquifer. Geraghty & <br />Miller, Inc., has equipment to prepare these logs and will <br />provide the services. In the Floridan Aquifer, more extensive <br />logging is necessary and the drilling contractor will provide <br />geophysical services. Among the logs that will be required <br />in the Floridan Aquifer are electric, gamma, temperature, <br />caliper, flow meter, and fluid conductivity logs. The hydro - <br />geologist will coordinate between Geraghty & Miller, the Joint <br />Venture, and the drilling contractor so that logging and any <br />other special testing procedures are completed on schedule. <br />Upon the completion of drilling, Geraghty & Miller, Inc., will <br />assist the contractor in the performance of pumping tests. At <br />least one controlled pumping test of approximately 72 hours' <br />duration will be conducted on the test -production well. This <br />test will be designed so that the hydrologic characteristics <br />of the Floridan Aquifer will be established. Factors to be <br />evaluated will be transmissivity, storage, vertical leakance, <br />and the potential for upconing. Knowledge of these charac- <br />teristics will serve as the basis for evaluating the impacts <br />of the proposed diversion aid determining optimum well yields. <br />Additional capacity tests and flow tests may be performed on <br />the test -production well and observation well. Geraghty & <br />Miller personnel will direct the contractor in the test proce- <br />dures, collect water -level and water -quality data during the <br />tests, and determine the testing periods. Water samples collec- <br />ted from the monitoring tube and from the pumped discharge dur- <br />ing the test will be forwarded to a chemical laboratory for <br />analysis. <br />Task 4 -- Analysis of Data and Preparation of Reports <br />Indian River County will receive monthly progress reports dur- <br />ing this program. Upon the completion of testing, Geraghty & <br />Miller, Inc., will analyze the data collected during the well <br />inventory, and the drilling and testing program, and prepare a <br />final report of the investigation. The report will describe <br />the steps taken during the drilling and testing program, and <br />present the pertinent data collected during the well inventory. <br />Geologic and hydrologic conditions in the taxing district and <br />surrounding area will be described. Based on the program <br />results, recommendations of well -field design, well construction, <br />DEC 1.9 1979 800x 2- PACE37 <br />