My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/9/1980
CBCC
>
Meetings
>
1980's
>
1980
>
1/9/1980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:48:51 AM
Creation date
6/11/2015 11:18:46 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
01/09/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JAN 91980 <br />Geraghty & Miller, Inc. <br />acx 42 PAGE524 <br />-5- 7 January 1980 <br />Additional capacity tests and flow tests may be performed on <br />the production well and observation well. Geraghty & Miller <br />personnel will direct the contractor in the test procedures, <br />collect water -level and water -quality data during the test, <br />and determine the testing periods. Water samples collected <br />from the monitoring tube and from the pumped discharge during <br />the test will be forwarded to a chemical laboratory for <br />analysis. <br />Because the scope of drilling in Task 3 will depend to a <br />great extent on the results of the well inventory, and the <br />skill and efficiency of the drilling contractor, the costs <br />for consulting services in Task 3 are difficult to estimate. <br />Assuming that an existing well could be used as an observation <br />well and that the drilling of only a single production well <br />would be necessary, charges for Task 3 consulting services <br />are estimated at $23,000. If no existing well is found to be <br />suitable, and the county elects to install one production <br />well and one observation well, charges for Task 3 consulting <br />services are estimated at $25,700. If the county chooses to <br />install two production wells (one of these wells would be <br />tested while the other is used for observation) charges for <br />consulting services are estimated at $28,500. <br />Task 4-- Analysis of Data and Preparation of Reports <br />Indian River County will receive monthly progress reports <br />during this program. Upon the completion of testing, Geraghty <br />& Miller, Inc., will analyze the data collected during the <br />well inventory and during the drilling and testing program, <br />and prepare a final report of the investigation. The report <br />will describe the steps taken during the drilling and testing <br />program, and present the pertinent data collected during the <br />well inventory. Geologic and hydrologic conditions in the <br />taxing district and surrounding area will be described. <br />Based on the program results, recommendations of well -field <br />design, well construction, and pumping schedules will be made. <br />An assessment will be made of the regional impact of the pro- <br />posed diversion from the Phase 1 withdrawal and from sub- <br />sequent phased withdrawals. The final report will be in a <br />form that will serve as a supporting document to a water -use <br />
The URL can be used to link to this page
Your browser does not support the video tag.