My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/9/1980
CBCC
>
Meetings
>
1980's
>
1980
>
1/9/1980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:48:51 AM
Creation date
6/11/2015 11:18:46 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
01/09/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geraghty & Miller, Inc. <br />7 January 1980 <br />application for the system. The estimated cost for con- <br />sulting services for Task 4 is $7,700. <br />Task 5-- Project Meeting, Conferences, and Related Work <br />After the completion of testing, Geraghty & Miller, Inc., will <br />have to work closely with Indian River County and the Joint <br />Venture in obtaining a water -use permit. It is anticipated <br />that correspondence and meetings will be necessary with <br />public agencies such as the St. Johns River Water Management <br />District and the Florida Department of Environmental Regula- <br />tion before the water -use permit can be obtained and con- <br />ceptual approval of the system can be granted. Therefore, <br />Task 5 has been included to allow for discussions and <br />correspondence necessary to complete the permit process. The <br />estimated cost for consulting services for Task 5 is $2,900. <br />PROJECT PERSONNEL AND TIMING <br />Geraghty & Miller's tasks in this program will.be directed by <br />a Senior Scientist of the firm who will act as project manager. <br />He will direct the firm's staff hydrogeologists.in the in- <br />ventory of wells, permittees, and legal users. Under his <br />direction, staff hydrogeologists will inspect the well drilling, <br />gather data during the testing program, assist the contractor <br />in the performance of pumping tests, and perform other field <br />tasks as required. The project manager will be responsible <br />for the preparation of all reports and correspondence related <br />to the project. Likewise, he will attend all meeting with <br />Indian River County and the Joint Venture, and if required, <br />he will also meet with public agencies on the County's behalf. <br />Mr. Tom Tessier, who has been involved in the preliminary in- <br />vestigation of the ground -water resources of the taxing <br />district, will be the project manager. Mr. Vincent P. Amy will <br />act as project advisor to provide overall guidance and to <br />assure that the program is carried out in keeping with the <br />past procedures of Indian River County and the policies of <br />Geraghty & Miller, Inc. He will also be available to attend <br />meetings and present testimony at public hearings on behalf of <br />the County, if requested. <br />The specifications and contractor's proposal form could be <br />available for public advertisement approximately four weeks <br />JAN 91980 <br />800!4 4z PAGE 52-5 <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.