My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/9/1980
CBCC
>
Meetings
>
1980's
>
1980
>
1/9/1980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:48:51 AM
Creation date
6/11/2015 11:18:46 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
01/09/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JAN 91980 <br />Geraghty & Miller, Inc. <br />eaoK 42 FACE 526 <br />-7- 7 January 1980 <br />after Geraghty & Miller is authorized to proceed with the <br />program. During that time also, Geraghty & Miller will initiate <br />the well inventory. After the close of bidding, it is anti- <br />cipated that a contract can be negotiated with the successful <br />bidder, and the contractor can be available at the site of work <br />within four weeks. The drilling and testing program will take <br />as much as twelve weeks to complete. Geraghty & Miller, Inc., <br />could then complete a report on the program in four weeks. <br />Thus, the program should take 5 to 6 1/2 months to complete, <br />including time to prepare the final report. <br />ESTIMATED COSTS <br />The total cost of the program has been estimated by allowing <br />for reasonable periods of time in which to perform specific <br />tasks. Since the scope of the drilling and testing program <br />(Task 3) cannot be finalized until the well inventory (Task 2) <br />is essentially complete, a cost breakdown has been prepared <br />that reflects estimated consultant's charges for the various <br />drilling and testing scenarios discussed previously. The costs <br />of tasks have been estimated based upon recent experiences of <br />Geraghty & Miller, Inc., and conversations with contractors. <br />Scenario I- Drilling and testing of one production well (with <br />deep zone monitoring tube) in the taxing district. This <br />scenario assumes that one or more existing wells will be suit- <br />able to serve for observation during a pumping test. <br />Task 1-- Preparation of Specifications and Contractor's <br />Proposal Form $5,000 <br />Task 2-- Compilation of Well, Permit, and <br />User Inventory 3,700 <br />Task 3-- Drilling of Single Production Well <br />and Associated Testing 23,000 <br />Task 4-- Reduction of Data and <br />Preparation of Reports• 7,700 <br />Task 5-- Project Meetings, Conferences and <br />Related Work 2,900 <br />The total cost for hydrogeologic consulting services for Scenario <br />I is estimated at $42,300. Associated contractor's charges for <br />drilling and testing of the production well are estimated at <br />$55,000 to $95,000. <br />
The URL can be used to link to this page
Your browser does not support the video tag.