My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2/6/1980
CBCC
>
Meetings
>
1980's
>
1980
>
2/6/1980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:48:51 AM
Creation date
6/11/2015 11:21:07 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
02/06/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Jack G. Jennings <br />January 29, 1980 <br />Page -two- <br />attached (Attachment B). Work on this phase commenced June 25, 1979 <br />and was completed July 27, 1979. In the second phase, a comprehen- <br />sive field inspection of each structure was performed. The inspection <br />determined the detailed physical characteristics of the bridge com- <br />ponents and their current condition, documented with photographs; <br />the condition of the watercourse beneath the bridge; and the charac- <br />teristics and the condition of the roadway approaches and their <br />effects on the bridge. The second phase commenced on July 30, 1979 <br />and was essentially complete September 21, 1979. The compilation of <br />the field inspection data and the inventory information into the <br />inspection report was accomplished in the third phase. The reports <br />include a map of the County with the structure location and State <br />bridge number noted; a determination of the load capacity of the <br />structure; the field inspection data detailing the current condition <br />of the structure; sketches providing details of the structure type <br />and location of structural deficiencies, if any; pertinent bridge <br />elevations; and watercourse details. Based on the above information, <br />a bridge evaluation sheet was prepared and included in the report. <br />This sheet serves as a summary establishing the bridge location and <br />provides a description of the bridge type, commentary on the bridge <br />condition, and recommendations for maintenance and structural im- <br />provements. Photographs are included in each report for documenta- <br />tion of location and condition. The DOT Structural Inventory and <br />Appraisal Form is then completed with a copy included in the report <br />and a copy attached which will be sent to the DOT. In addition to <br />the reports, a comprehensive wall map showing the locations and <br />bridge numbers for bridges under the County's jursidiction has been <br />completed and will be submitted to the County. <br />The program resulted in the location, inventory, and inspection of <br />80 bridges within Indian River County which are presently under the <br />County jurisdiction. The majority of these structures are in fair <br />to good condition with no structural deficiencies. Recommendations <br />for these bridges include maintenances items which will extend the <br />useful life of the structure and enhance the bridge's safety from a <br />traffic standpoint. However, 16 of the bridges inspected will re- <br />quire some structural rehabilitation or replacement -to maintain their <br />sturctural integrity. A summary of these bridges and the corresponding <br />required improvements are listed in Attachment C. One of the more <br />critical bridges on this list, Bridge Number 884002, was discussed <br />with the County in a meeting between Mr. Neil Nelson and Ms. Alma Lee <br />Loy, representing the County, and Messrs. John Robbins and Greg <br />Edmonds representing the joint venture, on October 11, 1979. Sub- <br />sequent to this meeting, adequate rehabilitative work was performed <br />FEB 61980 BOOK 42 Pa�E65Q <br />
The URL can be used to link to this page
Your browser does not support the video tag.