My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2/6/1980
CBCC
>
Meetings
>
1980's
>
1980
>
2/6/1980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:48:51 AM
Creation date
6/11/2015 11:21:07 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
02/06/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />FEB -61980 <br />Box 42 -aw 651 <br />Mr. Jack G. Jennings <br />January 29, 1980 <br />Page -three- <br />to ifiprove the bridge's structural integrity. The remaining bridges <br />listed on Attachment C should be schedule for the appropriate reha- <br />bilitation or replacement as soon as possible. <br />In accordance with Paragraph (2) of Section 338.071 of the Florida <br />Statutes, the County is required to perform inspections on its <br />bridges at intervals not to exceed 2 years. The future inspection, <br />in most cases, need not be as detailed as the inspection performed <br />under the subject Program. A recommended schedule for future in- <br />spection has been established and is attached (Attachment D). This <br />schedule requires many of the bridges to be inspected within one <br />year from the inspection date under this Program. This is adviseable <br />considering no previous information or inspection reports where <br />available on any of the bridges now under the County's jurisdiction._. <br />In addition to the 80 bridges inventoried and inspected under this <br />Program, there are five bridges in Indian River County which are <br />presently maintained by the DOT. Whether these bridges will be <br />turned over to the County is not known at this time. These bridges <br />are the four bridges in the structure of Wabasso Road (C-510) over <br />Indian River and the bridge at 27th Avenue (C-607) over the South <br />Relief Canal. The current status on the Wabasso River bridges is <br />detailed in Mr. John Robbins' letter of September 5, 1979 to Mr. <br />Jack G. Jennings (Attachment E). The current status of the 27th <br />Avenue Bridge is detailed in a letter dated June 25, 1979 from <br />Mr. Ray G. L'Amoreaux, Director, Division of Transportation Planning, <br />DOT, to the Chairman of the Board of County Commissioners, Indian <br />River County (Attachment F). <br />This submittal completes our <br />the subject Program, and we <br />on future bridge inspection <br />Very truly yours, <br />'Cq <br />Ralph /E. Eng / <br />For the Joint Venture <br />Attachments <br />responsibility under the contract for <br />look forward to working with the County <br />and report programs. <br />
The URL can be used to link to this page
Your browser does not support the video tag.