Laserfiche WebLink
RRTnar Nn <br />an 42 MGE655 <br />Attachment C <br />Paae 1 of 2 <br />MAINTENANCE RECOMMENDATIONS <br />Bridge 884011 <br />Extensive damage due to decay. Replace bridge as soon <br />as possible. <br />Bridge 880063 <br />Replace existing abutment at each end of the bridge. <br />Replace deck units in spans 1 and 6. Clean the spalls <br />on the bottom of the deck in spans 2, 3 and 4. Tie <br />all the slab units together in spans 2, 3 and 4" <br />Replace the damaged guardrail section at the <br />northeast end of the bridge. <br />Bridge 884002 <br />Replace deteriorated deck planking and stringers <br />immediately. Post gross load limit is 6 tons. <br />Schedule bridge for future replacement. <br />Bridge 884028 <br />Has erosion problems. On July 24, 1979, the east <br />bound land was closed while repairs where made to a <br />wash out at the southeast bridge end. The detailed <br />inspection on August 20, 1979 indicated the repair <br />work done to the wash out area as well as patching <br />areas adjacent to the east bridge end were failing. <br />On September 17, 1979 and December 18, 1979, visits <br />to the site showed the wash out progressing to a <br />critical stage, approaching the paved roadway. <br />Replace the eroded roadway embankment and the slope <br />at east bridge end and provide some means to channel <br />the water from the bridge and the roadway away from <br />the slope. <br />Bridge 884040 <br />Post bridge for gross load limit of 6 tons. <br />Bridge 884010 <br />Repair piling bent immediately. Post gross for load <br />limit of 6 tons. <br />Bridge 884014 <br />Replace the exterior stringer in span 2 on the north <br />side of the bridge. Post gross load limit of 6 tons. <br />Bridge 884026 <br />Replace bent cap No. 5 and deteriorated deck planking <br />and stringers immediately. Eliminate erosion of <br />embankment at bridge ends. Schedule bridge for future <br />replacement. Post gross load limit of 6 tons <br />immediately. <br />Bridge 880042 <br />Post narrow bridge signs on each approach. <br />Bridge 880064 <br />Spalls on the bottom of the deck exposing the rein- <br />forcing steel. The steel is beginning to corrode. <br />Patch spalls as soon as possible. <br />