Laserfiche WebLink
� � s <br />The Board of County Commissioners <br />Page Two <br />September 5, 1979 <br />5. Should prior corrective actions not be effective, the D.O.T. would have the re- <br />sponsibility of repairing the structure with other techniques. <br />6. The State had been inspecting this bridge on a two year frequency with the last <br />inspection having been completed in November of 1978. Mr. Chandler and Mr. <br />Allison stated the bridge would not require a comprehensive inspection until <br />November of 1980. The 1:980 inspectlbnould be the County's --responsibility. <br />7. The State will monitor the problems related to the design deficiency and trans- <br />mit copies of any reports on the structure to the County so the County can also <br />monitor the status of corrective action. <br />As you are aware, the Contract between the County and the Joint Venture treated the <br />;Iabasso Bridges separate from other County bridges for the purpose of inspection. <br />Since the State has now indicated the Wabasso Bridge will not require inspection <br />antiL November of 1980, we r6 nd;,the>comprehensive:inspibt ont €tir��°th'd Wabasso <br />BridF,e be•postponed'until November of 19$0:` Please be advised, we will be able to <br />perfor6'th se inspection6. in November of.1980 upon your authorization. <br />Should you have any questions, or if I may be of any assistance in this :..atter, <br />please do not hesitate to call. <br />Very truly yours, <br />John A. Robbins <br />JAR:mk <br />cc: Mr. Neil Nelson, Assistant County Administrator, <br />Indian River County, Florida <br />Mr. H. C. Chandler, Department of Transportation, <br />State of Florida <br />Mr. J. Allison, Department of Transportation, <br />State of Florida <br />f E B 61980 Book 42 FAG "66 <br />63 . <br />