Laserfiche WebLink
I <br />FEB - 6 19 00 <br />aoox <br />42 <br />i*GE 661 <br />MR. <br />ROBBINS INFORMED THE BOARD THAT ALTHOUGH THE <br />DOT <br />HAD <br />INDICATED THEY WOULD PERFORM AN ADDITIONAL INSPECTION OF THE WABASSO <br />BRIDGE TO DETERMINE IF THERE IS ANY DISCREPANCY, WHEN HE TALKED <br />WITH MR. CHANDLER YESTERDAY, HE WAS NOT AWARE OF ANY FUTURE ACTIVITY <br />ASSOCIATED WITH THAT BRIDGE. MR. ROBBINS CONTINUED THAT HE HAS A <br />CALL IN TO MR. ALLISON, WHO IS SPECIFICALLY ASSOCIATED WITH THE <br />WABASSO BRIDGE, AND HE INTENDS TO INDICATE TO MR. ALLISON THAT THE <br />COUNTY IS GOING TO PURSUE THIS MATTER FURTHER. HE FELT THAT IT <br />WOULD BE WORTHWHILE TO HAVE THIS INSPECTION REPORT MATERIAL HAND <br />DELIVERED TO THE DOT IN FORT LAUDERDALE, WHICH WOULD PRESENT AN <br />OPPORTUNITY TO SIT DOWN WITH THEM AND DISCUSS THIS MATTER, <br />COMMISSIONER WODTKE NOTED THAT THE ENGINEERS RECOMMEND <br />POSTING A 6 -TON LOAD LIMIT ON SOME OF THESE BRIDGES, AND HE WAS <br />CONCERNED ABOUT OUR LEGAL LIABILITIES. <br />ADMINISTRATOR JENNINGS INFORMED THE BOARD.THAT AS SOON AS <br />THE FIRST RED FLAG REPORTS WERE RECEIVED, HE HAD THE ROAD R BRIDGE <br />CREWS POST 5 -TON LOAD LIMITS ON THE SPECIFIED BRIDGES. HE THEN <br />SHOWED THE BOARD A SAMPLE OF THE INDIVIDUAL REPORTS AND DOCUMENTA- <br />TION ON EACH BRIDGE, WHICH CAN BE REFERRED TO IF THERE IS EVER A <br />NEED FOR FEDERAL FUNDING. HE CONTINUED THAT HE HAS COMPLETED REPAIRS <br />ON TWO OF THE BRIDGES AND STATED THAT IT IS HIS INTENTION TO CONTINUE <br />WORKING ON ALL THE BRIDGES THAT ARE RED FLAGGED. HE NOTED THIS WILL <br />RUN INTO MONEY AND THAT IS WHY WE NEED TO DETERMINE WHETHER WE CAN <br />KEEP A RECORD OF COSTS AND BE REIMBURSED. <br />COMMISSIONER LOY EXPRESSED THE HOPE THAT WE CAN BE REIM- <br />BURSED, BUT FELT WE MUST CONTINUE WITH THESE REPAIRS IN ANY EVENT. <br />IN FURTHER DISCUSSION IN REGARD TO THE CONTRACT WITH THE <br />ENGINEERS, IT WAS GENERALLY AGREED IT WOULD BE BETTER NOT TO TERMINATE <br />THE PRESENT CONTRACT. <br />ON MOTION BY COMMISSIONER Loy, SECONDED BY COMMISSIONER <br />WODTKE, COMMISSIONER DEESON AND CHAIRMAN SIEBERT VOTED IN FAVOR, <br />THE BOARD ACCEPTED THE BRIDGE INSPECTION REPORT AS SUBMITTED BY THE <br />,JOINT VENTURE AS COMPLETE AND AGREED TO LET THE CONTRACT WITH THE <br />,JOINT VENTURE IN THIS REGARD CONTINUE IN ITS CURRENT STATUS. <br />