My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2/20/1980
CBCC
>
Meetings
>
1980's
>
1980
>
2/20/1980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:48:52 AM
Creation date
6/11/2015 11:23:05 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
02/20/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Blending Man's Work With God's World <br />EDwin S. Schmucker, P.E. <br />President <br />Board of County Commissioners <br />Indian River County Courthouse <br />2145 14th Avenue <br />Vero Beach, Florida 32960 <br />Attn: Neil Nelson <br />Post Office Box 10 <br />Vero Beach, Florida - 32960 <br />Telephone (305) 567-9360 <br />February 14, 1980 <br />Project #76726 <br />As of the date of this letter, the West 2 streets (Phase I) of the <br />Pine Crest; Subdivision have been completed with the exception of the <br />water plant (balance due fabricator and installation contractor <br />Twenty five thousand six hundred eighty six ($25,686.00) dollars) and <br />three items which should be completed by 2-20-80. The three items are <br />the backfilling of the water line trenches (water distribution lines <br />are in place), the regrading and seeding of the swale ditches after <br />the backfill has been completed and the installation of the concrete <br />footings for the storage tanks and pump housing building. <br />Respectfully, <br />TOTAL DEVELOPMENT, INC., <br />Edwin S. Schmucker, P.E. <br />President <br />ESSIdjs <br />RECOMMEND APPROVAL SUBJECT TO COMPLETION OF THE WATER SYSTEM, <br />BACK -FILLING OF THE WATERLINE TRENCHES AND THE REGRADING <br />AND SEEDING OF THE SWALE DITCHES, <br />1 <br />L.. <br />Neil a son <br />ENGINEER SCHMUCKER EXPLAINED THAT THIS SUBDIVISION IS <br />LOCATED IN THE WEST HALF OF THE 40 ACRE TRACT; THE STREETS ARE IN, <br />THE WATER LINES ARE INSTALLED BUT THEY HAVE NOT BEEN BACK-FILLED AND <br />COMPLETED -DUE TO THE RAIN. HE STATED THAT A $25,686 CASH BOND HAS <br />FEB 2 01980 <br />E <br />BOOK 42 ' FA b9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.