My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2/27/1980
CBCC
>
Meetings
>
1980's
>
1980
>
2/27/1980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:48:52 AM
Creation date
6/11/2015 11:23:31 AM
Metadata
Fields
Template:
Meetings
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />FE2 71994 BOOK 42. PtGE $Q1 <br />BUT HE FELT IT IS THE ATTITUDE OF THE PEOPLE IN THE BUILDING THAT <br />CAN MAKE THE RENOVATION WORK OR NOT. HE NOTED THAT THEY ARE NOT <br />GOING TO COME IN AND SHUT DOWN A WHOLE DEPARTMENT WITHOUT NOTICE, <br />AND AGAIN MENTIONED THE COOPERATION GIVEN BY THE STAFF OF THE MARTIN <br />MEMORIAL HOSPITAL AND STATED THAT HE FELT -HIS PEOPLE COULD GO IN <br />AND REMODEL ANY PLACE. <br />COMMISSIONER LYONS ASKED THE ATTORNEY IF HE HAD ANY LEGAL <br />PROBLEM WITH ACCEPTING THE BID FOR THE HOSPITAL RENOVATION CONDITIONED <br />ON THE RECEIPT OF THE APPROVED SITE PLAN, AND ATTORNEY COLLINS STATED <br />THAT HE WOULD NOT LIKE TO SEE THE CONTRACT SIGNED UNTIL WE HAVE RE- <br />CEIVED SITE PLAN APPROVAL, BUT FELT IT COULD BE AWARDED. <br />COORDINATOR THOMAS FELT WE ARE IN A BETTER POSITION EVEN <br />WITH THAT CONDITION. <br />MOTION WAS MADE BY COMMISSIONER LYONS, SECONDED BY COMMIS- <br />SIONER Loy, TO ACCEPT THE BID OF REINHOLD CONSTRUCTION, INC., FOR <br />THE REMODELING OF THE OLD HOSPITAL BUILDING IN THE AMOUNT OF $2,748,000 <br />CONDITIONED UPON RECEIPT OF SITE PLAN APPROVAL FROM THE CITY OF VERO <br />BEACH AND ALSO TO ACCEPT THE ALTERNATE BID OF $400.00 PER UNIT FOR <br />THE WINDOWS; THE CONTRACT NOT TO BE SIGNED UNTIL CONDITIONS ARE MET. <br />ATTORNEY COLLINS COMMENTED THAT IT MIGHT BE WISE TO RESERVE <br />THE RIGHT TO ACCEPT THE SECOND BID WITHIN THE TIME FRAME ALLOWED. <br />COMMISSIONER WODTKE FELT THERE IS NO WAY WE CAN DO ONE JOB <br />WITHOUT ALSO DOING THE OTHER AND THAT THE ONLY REASON WE ARE GOING <br />AT IT THIS WAY IS TO ALLOW THE COORDINATOR TO PUSH AHEAD WITH THE <br />BONDS. HE CONTINUED THAT HE WOULD LIKE TO HAVE AT LEAST A WEEK MORE <br />AND STATED THAT HE DID NOT WANT TO MAKE SOMETHING CONTINGENT ON SITE <br />PLANT APPROVAL THEREBY PUTTING PRESSURE ON THE CITY OF VERO BEACH. <br />HE STATED THAT HE WOULD FEEL MUCH HAPPIER IF WE MAKE SUCH A MOTION <br />TO INCLUDE BOTH OF THE PROJECTS. <br />CHAIRMAN SIEBERT ASKED THE COORDINATOR IF HE CAN PROCEED <br />ONCE THE CONTRACT IS AWARDED, AND MR. THOMAS STATED THAT IF THE <br />BID IS AWARDED, HE CAN PROCEED WITH THE RATING PROCESS IMMEDIATELY. <br />
The URL can be used to link to this page
Your browser does not support the video tag.